My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-14-2023 Council Meeting Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2023
>
Searchable Packets
>
08-14-2023 Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2023 10:08:43 AM
Creation date
8/15/2023 10:02:06 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/14/2023
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />\\metro-inet\linolakes\Shared\Community Development\Projects\Capital Improvement Projects\2023 Trunk Watermain Lake Drive\Staff Reports\20230814 CC <br />Award Project\5. 021892-000 Construction Services Proposal.docx 178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM August 14, 2023 <br /> <br />Mr. Michael Grochala <br />Community Development Director <br />City of Lino Lakes <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br /> <br /> <br />Re: Proposal for Construction Services for Lake Drive Trunk Water Main <br />Improvements <br />WSB Project No. R-021892-000 <br /> <br />Dear Mr. Grochala: <br /> <br />WSB & Associates, Inc. is providing a proposal for construction services associated with <br />the Lake Drive Trunk Watermain Improvements. This construction services proposal <br />would be subsequent to the City Council awarding the construction contract. <br /> <br />The project includes directionally drilling new 12-inch diameter water main along Lake <br />Drive (CSAH 23) from Forsham Lake Drive to Park Court (approximately 0.18 miles) to <br />connect the existing water systems. <br /> <br />Scope of Engineering Services <br /> <br />WSB is pleased to provide professional construction engineering services for the Lake <br />Drive Trunk Watermain Improvements including contract administration, construction <br />observation, construction staking, and public notice and weekly updates for project <br />stakeholders. Below is a detailed description of the engineering services and WSB’s <br />proposed approach. <br /> <br />I. Construction Services <br />a. Project Management/Contract Administration <br />Contract Administration includes holding meetings with the contractor & City <br />of Lino Lakes (preconstruction & weekly construction), processing monthly <br />quantities for pay vouchers, and communicating with residents on a regular <br />basis. <br /> <br />b. Construction Observation <br />WSB will provide an experienced engineering specialist whose <br />responsibilities will include communicating with the Contactor as an agent of <br />the City, calculating and keeping track of daily construction quantities and <br />costs, contact and meet with residents as necessary, and work with the <br />Contractor to assist with a quality constructed product. <br /> <br />c. Construction Staking (Survey)
The URL can be used to link to this page
Your browser does not support the video tag.