Laserfiche WebLink
Amelia Ditch Study <br />August 10, 2023 <br />Page 20 <br /> <br /> <br />Cost Estimate - Short Term <br />Description Units <br />Contract <br />Quantity Unit Price Total Price <br />MOBILIZATION LS 1 $15,000 $15,000 <br />CLEAR AND GRUB LS 1 $25,000 $25,000 <br />DEWATERING LS 1 $20,000 $20,000 <br />COMMON EXCAVATION C C Y 700 $30 $21,000 <br />CHANNEL EXCAVATION C Y 1500 $40.00 $60,000 <br />RANDOM RIPRAP CL III C Y 30 $120 $3,600 <br />36" RCP L F 31 $220 $6,820 <br />36" RCP APRON EACH 2 $3,200 $6,400 <br />STABILIZED CONSTRUCTION ENTRANCE EACH 1 $1,500 $1,500 <br />FLOATING SILT CURTAIN L F 20 $40 $800 <br />EROSION CONTROL BLANKET S Y 3500 $3 $10,500 <br />WOOD FIBER BIOROLL L F 5500 $3 $16,500 <br />SEEDING ACRE 1.5 $2,000 $3,000 <br />SEED MIX 33-261 LB 55 $75 $4,125 <br /> 30% Contingency $58,300 <br /> Total: $252,500 <br />