My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-28-2023 Council Meeting Packet - Amended
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2023
>
Searchable Packets
>
08-28-2023 Council Meeting Packet - Amended
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2023 10:13:00 AM
Creation date
8/29/2023 9:58:54 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/28/2023
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Milestones Addition <br />Development Agreement <br />August 28, 2023 <br /> page 3 <br />iv. The Developer’s engineer shall certify in writing, with an as-built survey, <br />that all grading complies with the approved grading plan prior to issuance <br />of a building permit. <br />v. The Developer shall promptly clear dirt and debris within public rights-of- <br />way and drainage and utility easements resulting from construction by <br />the Developer, its purchasers, builders and contractors within five (5) <br />days after notification by the City. The Developer shall be responsible for <br />all necessary street and storm sewer maintenance, including street <br />sweeping, until all home construction is completed, unless otherwise <br />released by the City. Warning signs shall be placed when hazards <br />develop in streets to prevent the public from traveling on them, including <br />detour signs if necessary. If and when the streets become impassable, <br />such streets shall be barricaded and closed. The Developer shall maintain <br />a smooth, hard driving surface and adequate drainage on all temporary <br />streets. <br />c. Final street/ parking lot grading, subbase, gravel base, concrete curb and gutter, <br />and bituminous base and wear course, street signs and striping shall be <br />furnished and installed. <br />d. Lighting shall be installed within 6 months of the bituminous base course. <br />Extensions may be approved by the City Engineer, due to weather conditions, <br />upon receipt of a written request in writing by the Developer to the City. In no <br />case shall such extension extend beyond one year from the date of installation of <br />bituminous base course. <br />e. Storm sewers, when determined to be necessary by the City Engineer, including <br />all necessary laterals, catch basins, inlets and other appurtenances, shall be <br />furnished and installed. <br />f. Sanitary sewer mains, laterals or extensions, including all necessary building <br />services and other appurtenances, shall be furnished and installed. <br />g. Water mains, laterals or extensions, including all necessary building services, <br />hydrants, valves and other appurtenances, shall be furnished and installed. <br />h. The Developer shall place iron monuments at all lot, block, and outlot corners <br />and at all other angle points on boundary lines consistent with the final plat. <br />Iron monuments shall be placed after all street and lawn grading has been <br />completed in order to preserve the lot markers for future property owners. Lot <br />corner irons on the back property line shall be installed so that the top of the <br />iron corresponds to the finished ground elevation in accordance with the
The URL can be used to link to this page
Your browser does not support the video tag.