My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-28-2023 Council Meeting Packet - Amended
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2023
>
Searchable Packets
>
08-28-2023 Council Meeting Packet - Amended
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2023 10:13:00 AM
Creation date
8/29/2023 9:58:54 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/28/2023
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF LINO LAKES <br />RESOLUTION NO. 23-89 <br />AUTHORIZING PREPARATION OF A FEASIBILITY REPORT FOR MUNICIPAL <br />SEWER AND WATER EXTENSION ASSOICATED WITH THE 2024 STREET <br />RECONSTRUCTION PROJECT <br />WHEREAS, pursuant to Resolution 23-58 the City Council approved a 5 year Street <br />Reconstruction Plan that would be funded through street reconstruction bonds, and <br />WHEREAS, The City is proposing to reconstruct the Pine Haven Area including 81st Street, <br />Elbe Street, Danube Street and the Red Maple Lane neighborhood, and <br />WHEREAS, the City Council finds it is in the best interest of the City to consider the extension <br />of sanitary sewer and water utilities within these neighborhoods at the time of reconstruction, <br />and to assess the benefited property for all or a portion of the cost of the utility extension, <br />pursuant to Minnesota Statutes, Chapter 429 and the City Charter, and <br />WHEREAS, the number of benefitted property owners is estimated at 59 and will be determined <br />as part of the report. <br />NOW, THEREFORE BE IT RESOLVED by the City Council of the City of Lino Lakes: <br />That the City Council directs staff to prepare a feasibility report to include the number of <br />benefitted property owners and all necessary project costs in both unit price and in total for all <br />components of the project including, but not limited to, the extension of sanitary sewer and water <br />utilities. <br />BE IT FURTHER RESOLVED That the proposed improvement be referred to WSB and <br />Associates, Inc., for study and that they are instructed to report to the council with all convenient <br />speed advising the council in a preliminary way as to whether the proposed improvement is <br />necessary, cost-effective, and feasible; whether it should best be made as proposed or in connection <br />with some other improvement; the estimated cost of the improvement as recommended; and a <br />description of the methodology used to calculate individual assessments for affected parcels. <br />Adopted by the Council of the City of Lino Lakes this 28th day of August, 2023. <br />_______________________________ <br />Rob Rafferty, Mayor <br />ATTEST: <br />________________________ <br />Jolleen Chaika, City Clerk
The URL can be used to link to this page
Your browser does not support the video tag.