My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09/13/2023 P&Z Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2023
>
09/13/2023 P&Z Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2023 9:01:29 AM
Creation date
9/8/2023 8:56:48 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
09/13/2023
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 <br /> <br />bicycle racks, benches, planting boxes, awnings, flag poles, light standards, stairs, stoops, light <br />wells, loading wells, signs and others. <br />2. Public and quasi-public utility poles and underground services may be permitted <br />within public right-of-way provided that: <br />a. A permanent identification tag or marking is affixed to each structure. <br />b. The City is notified as to the location and date of placement of the structure. <br />c. The City is notified of any change of structure ownership, removal or <br />modification. <br />d. Lease or joint use agreements or arrangements applicable to each utility <br />structure are disclosed. <br />(f) Completion of Exterior Improvements. <br />1. All exterior improvements of a structure, or portion thereof, to single family <br />dwellings, multiple family dwellings of twelve (12) units or less, or any structure accessory to a <br />residential use shall be completed in accordance with City-approved construction plans within one <br />hundred eighty (180) days after the date the City issued the building permit. <br />2. All exterior improvements of a structure, or portion thereof, to multiple family <br />dwellings of more than twelve (12) units or any commercial, industrial, office, institutional or non- <br />residential structure shall be completed in accordance with City-approved construction plans <br />within one (1) year after the date the City issued the building permit. <br />3. In all cases, the compliance deadline shall be upheld unless: <br />a. The process for a temporary Certificate of Occupancy is completed as <br />described in the City Fee Schedule, as amended, which would extend the completion date beyond <br />those listed in paragraphs 1. and 2. above; or <br />b. A written extension is submitted and approved by the Building Official. Such <br />an extension may be granted in the event that a natural disaster or a calamitous event occurs which <br />unavoidably delays the completion of the building project. <br />4. For building permits issued prior to the effective date of the ordinance amendment <br />establishing the time limits in paragraphs 1. and 2. above (Ordinance No. 01-08), the time period <br />for the limits begins with the effective date of the amendment establishing the time limits. <br /> <br />Off-Street Parking <br /> <br />The old ordinance requirement for Fast Food parking spaces was fifteen (15) spaces per 1,000 sf <br />of gross floor area. The new ordinance is one (1) space per 50sf of floor area plus one (1) space
The URL can be used to link to this page
Your browser does not support the video tag.