My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10-02-2023 Council Work Session Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2023
>
Searchable Packets
>
10-02-2023 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2023 1:52:55 PM
Creation date
10/3/2023 10:07:03 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/02/2033
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> 178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM Memorandum <br /> <br />To: Katie Larsen, Lino Lakes City Planner <br /> <br />From: Diane Hankee PE, Lino Lakes City Engineer <br /> <br />Date: September 27, 2023 <br /> <br />Re: Glamos Wire Storage Expansion <br /> CUP Plan Review <br /> 023534-000 <br /> <br /> <br />WSB reviewed the plans for the Glamos Wire Storage Expansion site in Lino Lakes, MN, received <br />September 22, 2023. The site is 17.93 acres and located at 2300 Main Street South of County <br />Road 14 and east of County Road 84. Comments were made on the following documents: <br /> <br />• Glamos Wire Outdoor Expansion plans prepared by Bolton & Menk, dated September 21, <br />2023 <br /> <br />The following review comments should be responded to in writing by the applicant. <br /> <br />Bolton & Menk (9/21/2023) Responses in red. <br />WSB (9/27/2023) responses and new comments in blue. <br /> <br />Engineering <br /> <br />• Grading <br /> <br />A grading plan was provided for the storage expansion including paved areas, curb, and <br />a basin. Water from the previous storage area to the north is collected in a drainage <br />swale that runs around the outside of the curbed area (western) or sheet flows through <br />this paved area (eastern) <br /> <br />Comments: <br />1. The applicant shall clarify the proposed rim elevation of the pond OCS. The detail <br />shows an elevation of 910.4 and the drainage plan sheet shows 908.1. <br />(BM 9/21/2023) Rim elevation on Sheet C3.01 has been updated. <br /> <br />2. Call out the EOF for basin <br />(BM 9/21/2023) EOF location and elevation have been called out on plans. <br /> <br />3. Eliminate the southwestern curb cut and direct drainage from northwestern corner to <br />southern curb cut to minimize short circuiting of basin for treatment (0.8% slope) <br />(BM 9/21/2023) Southwestern curb cub has been removed. <br /> <br />4. Existing spot elevations do not appear to match the existing contours in the previous <br />storage area in the northeast corner. <br />(BM 9/21/2023) Sheet C3.01 has been updated. <br />
The URL can be used to link to this page
Your browser does not support the video tag.