My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10-09-2023 Council Meeting Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2023
>
Searchable Packets
>
10-09-2023 Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2023 5:22:41 PM
Creation date
10/9/2023 4:22:27 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/09/2023
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />CITY COUNCIL <br />REGULAR MEETING STAFF REPORT <br />AGENDA ITEM 6D <br />STAFF ORIGINATOR: Diane Hankee, City Engineer <br />MEETING DATE: October 9, 2023 <br />TOPIC: Consider Resolution Number No. 23-96, Authorize the Preparation <br />of Plans and Specs, 2024 Street Rehabilitation and Trunk <br />Watermain Project <br />VOTE REQUIRED: 3/5 <br />______________________________________________________________________________ <br />INTRODUCTION <br />Staff is requesting Council authorization to prepare plans and specifications for the 2024 Street <br />Rehabilitation and Trunk Watermain Project. <br />BACKGROUND <br />The 2024 Street Rehabilitation improvements are part of the City’s Capital Improvement Plan <br />which is based off the City’s Pavement Management Program. The Pavement Management <br />Program evaluates the condition of the roadways and provides recommendations for maintenance <br />for the City’s entire network of roadways. The proposed 2024 Street Rehabilitation <br />Improvements Project includes the following: <br />Mill and Overlay (approximately 1.7 miles) – Black Duck Circle (from Black Duck Drive to <br />cul-de-sac), Black Duck Drive (from Black Duck Circle to Birch Street), Black Duck Court <br />(from Black Duck Drive to cul-de-sac), Beaver Circle (from Deerwood Lane to cul-de-sac), <br />Deerwood Circle (from Deerwood Lane to cul-de-sac), Deerwood Lane (cul-de-sac), Linda <br />Lane (from Hodgson Road to 62nd St Trail Crossing), Linda Court (from Linda Lane to cul-de- <br />sac), and Linda Circle (from Linda Lane to cul-de-sac), and Linda Ave (from Linda Lane to <br />Ware Road). <br />Mill and Overlay Bid Alternate: Aspen Lane (from Killdeer Drive to cul-de-sac) <br />The City’s Water Treatment Plant feasibility study identified the need for new trunk water main <br />and a raw water supply line along Black Duck. Accordingly, in addition to the roadway project, the <br />City will be installing trunk watermain improvements along Blackduck Drive. This will include <br />directionally drilling two segments of 12” diameter watermain along the northern portion of <br />Blackduck Drive. It will also include directional drilling 16” raw watermain along the southern
The URL can be used to link to this page
Your browser does not support the video tag.