Laserfiche WebLink
1 <br />CITY COUNCIL <br />REGULAR MEETING STAFF REPORT <br />AGENDA ITEM 6D <br />STAFF ORIGINATOR: Diane Hankee, City Engineer <br />MEETING DATE: October 9, 2023 <br />TOPIC: Consider Resolution Number No. 23-96, Authorize the Preparation <br />of Plans and Specs, 2024 Street Rehabilitation and Trunk <br />Watermain Project <br />VOTE REQUIRED: 3/5 <br />______________________________________________________________________________ <br />INTRODUCTION <br />Staff is requesting Council authorization to prepare plans and specifications for the 2024 Street <br />Rehabilitation and Trunk Watermain Project. <br />BACKGROUND <br />The 2024 Street Rehabilitation improvements are part of the City’s Capital Improvement Plan <br />which is based off the City’s Pavement Management Program. The Pavement Management <br />Program evaluates the condition of the roadways and provides recommendations for maintenance <br />for the City’s entire network of roadways. The proposed 2024 Street Rehabilitation <br />Improvements Project includes the following: <br />Mill and Overlay (approximately 1.7 miles) – Black Duck Circle (from Black Duck Drive to <br />cul-de-sac), Black Duck Drive (from Black Duck Circle to Birch Street), Black Duck Court <br />(from Black Duck Drive to cul-de-sac), Beaver Circle (from Deerwood Lane to cul-de-sac), <br />Deerwood Circle (from Deerwood Lane to cul-de-sac), Deerwood Lane (cul-de-sac), Linda <br />Lane (from Hodgson Road to 62nd St Trail Crossing), Linda Court (from Linda Lane to cul-de- <br />sac), and Linda Circle (from Linda Lane to cul-de-sac), and Linda Ave (from Linda Lane to <br />Ware Road). <br />Mill and Overlay Bid Alternate: Aspen Lane (from Killdeer Drive to cul-de-sac) <br />The City’s Water Treatment Plant feasibility study identified the need for new trunk water main <br />and a raw water supply line along Black Duck. Accordingly, in addition to the roadway project, the <br />City will be installing trunk watermain improvements along Blackduck Drive. This will include <br />directionally drilling two segments of 12” diameter watermain along the northern portion of <br />Blackduck Drive. It will also include directional drilling 16” raw watermain along the southern