My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10-09-2023 Council Meeting Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2023
>
Searchable Packets
>
10-09-2023 Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2023 5:22:41 PM
Creation date
10/9/2023 4:22:27 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/09/2023
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Glamos Wire, Inc. Site Performance Agreement page 2 of 11 <br />A. On-Site Work. The On-Site Work shall consist of the improvements <br />described in the approved Plans, to include any approved subsequent <br />amendments, and shall be in compliance with all applicable statutes, codes <br />and ordinances of the City. The On-Site Work includes all on-site exterior <br />amenities as shown on the approved Plans and as required by the plan <br />approval, such as, but not limited to: landscaping, private driveways, <br />parking areas, sanitary sewer extension, water system extension, storm <br />drainage systems, curbing, lighting, fencing, fire lanes, sidewalks, exterior <br />building architectural design and building elements, site grading and <br />erosion control measures. <br /> <br />Such improvements shall be completed in accordance with Section IV <br />herein. <br /> <br />B. Cost Estimates. The Developer shall provide the City with a written <br />estimate of all applicable costs of the On-Site Work, itemized by type; the <br />estimates shall be based upon the actual estimates provided by the <br />contractors who are to do the Work. Said cost estimates shall be reviewed <br />by the City, and the City shall establish the actual amount of the financial <br />guarantee. The description and estimated cost of Developer's On-Site <br />Work are as follows: <br /> <br /> Description of Improvements Estimated Costs <br />1. Lighting $ 20,000.00 <br />2. Fences / Screen Structures $ 50,720.00 <br />3. Trash Disposal Structures $15,000.00 <br />4. Curbing / Islands / Delineators $ 28,700.00 <br />5. Storm Drainage Systems / Sewers / Catch Basins / <br />Culverts / Swales $36,100.00 <br />6. Mobilization $ 10,000.00 <br />7. Private Trails and / or Sidewalk $ 0.00 <br />8. Driveway / Curb cut / Parking Lot / Fire Lane $ 270,200.00 <br />9. Water mains / Hydrants / Sanitary Sewers $ 0.00 <br />10. Landscaping $ 30,000.00 <br />11. Site Grading $19,868.00 <br />12. Erosion Control $10,000.00 <br /> Total Estimated Cost of Developer Improvements $490,588.00 <br /> Security Requirement (Total * 35%) $ 171,705.80 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.