My WebLink
|
Help
|
About
|
Sign Out
Home
Search
Resolution 23-109
LinoLakes
>
City Council
>
City Council Resolutions
>
2023
>
Resolution 23-109
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2023 9:26:24 AM
Creation date
10/12/2023 9:26:23 AM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
10/09/2023
Council Meeting Type
Regular
Resolution #
23-109
Resolution Title
Authorizing Preparation of Well No. 4 Repurposing Plan
Resolution Date Passed
10/09/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF LINO LAKES <br /> RESOLUTION NO. 23-109 <br /> AUTHORIZING PREPARATION OF WELL NO. 4 REPURPOSING PLAN <br /> WHEREAS, Ramsey County District Court Order issued a judgment 62-CV-13-2414 on <br /> August 30, 2017 regarding the groundwater management of White Bear Lake and the Prairie du <br /> Chein-Jordan Aquifer; and <br /> WHEREAS, Groundwater pumping from high capacity wells within 5 miles of White Bear <br /> Lake has been identified as a factor in fluctuating lake levels; and <br /> WHEREAS, the City of Lino Lakes as a good steward of the natural resources is sensitive <br /> to and recognizes its responsibility to minimize impact to the aquifer and other water resources, <br /> where feasible; and <br /> WHEREAS, the City has received state grant funding and is preparing plans and <br /> specifications to begin construction of a Water Treatment Plant in 2024, and <br /> WHEREAS, operation of the plan will allow the City to shift well water pumping to <br /> wellheads located outside the 5 mile radius that are directly connected to the plant; and <br /> WHEREAS, the City has only one well, No. 4, within the 5 mile radius of White Bear Lake, <br /> which is also one of the City's highest producing wells, and <br /> WHEREAS, as part of the Water Treatment Plant operational plan, Well No. 4 could be <br /> repurposed as a peaking well used for peak periods and emergencies; and <br /> WHEREAS, repurposing Well No. 4 as a peaking well is estimated to reduce its pumping <br /> volumes from an 3 year average of 189 million gallons per year (MGY)to 50 MGY; <br /> NOW, THEREFORE, BE IT RESOLVED by the City Council of Lino Lakes, Minnesota that <br /> City staff is hereby authorized and directed to work with WSB LLC, the City Engineer, to <br /> develop a plan that repurposes Well No. 4 to a peaking well to become effective upon <br /> construction and operation of the water treatment plant. <br />
The URL can be used to link to this page
Your browser does not support the video tag.