My WebLink
|
Help
|
About
|
Sign Out
Home
Search
Resolution 23-102
LinoLakes
>
City Council
>
City Council Resolutions
>
2023
>
Resolution 23-102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2023 9:33:38 AM
Creation date
10/12/2023 9:33:31 AM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
10/09/2023
Council Meeting Type
Regular
Resolution #
23-101
Resolution Title
Resolution Approving a Site Improvement Performance Agreement with Glamos Wire
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. On-Site Work. The On-Site Work shall consist of the improvements <br /> described in the approved Plans, to include any approved subsequent <br /> amendments, and shall be in compliance with all applicable statutes, codes <br /> and ordinances of the City. The On-Site Work includes all on-site exterior <br /> amenities as shown on the approved Plans and as required by the plan <br /> approval, such as, but not limited to: landscaping,private driveways, <br /> parking areas, sanitary sewer extension,water system extension, storm <br /> drainage systems, curbing, lighting, fencing, fire lanes, sidewalks, exterior <br /> building architectural design and building elements, site grading and <br /> erosion control measures. <br /> Such improvements shall be completed in accordance with Section IV <br /> herein. <br /> B. Cost Estimates. The Developer shall provide the City with a written <br /> estimate of all applicable costs of the On-Site Work, itemized by type; the <br /> estimates shall be based upon the actual estimates provided by the <br /> contractors who are to do the Work. Said cost estimates shall be reviewed <br /> by the City, and the City shall establish the actual amount of the financial <br /> guarantee. The description and estimated cost of Developer's On-Site <br /> Work are as follows: <br /> Description of Improvements Estimated Costs <br /> 1. Lighting $ 20,000.00 <br /> 2. Fences/ Screen Structures $ 50,720.00 <br /> 3. Trash Disposal Structures $15,000.00 <br /> 4. Curbing /Islands/Delineators $ 28,700.00 <br /> 5 Storm Drainage Systems / Sewers/ Catch Basins / $36,100.00 <br /> Culverts/ Swales <br /> 6. Mobilization $ 10,000.00 <br /> 7. Private Trails and/or Sidewalk $ 0.00 <br /> 8. Driveway / Curb cut/Parking Lot/Fire Lane $ 270,200.00 <br /> 9. Water mains/Hydrants/ Sanitary Sewers $ 0.00 <br /> 10. Landscaping $ 30,000.00 <br /> 11. Site Grading $19,868.00 <br /> 12. Erosion Control $10,000.00 <br /> Total Estimated Cost of Developer Improvements $490,588.00 <br /> Security Requirement(Total * 35%) $ 171,705.80 <br /> Glamos Wire,Inc. Site Performance Agreement page 2 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.