My WebLink
|
Help
|
About
|
Sign Out
Home
Search
Resolution 23-102
LinoLakes
>
City Council
>
City Council Resolutions
>
2023
>
Resolution 23-102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2023 9:33:38 AM
Creation date
10/12/2023 9:33:31 AM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
10/09/2023
Council Meeting Type
Regular
Resolution #
23-101
Resolution Title
Resolution Approving a Site Improvement Performance Agreement with Glamos Wire
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
For residential properties, the availability charge shall be paid at the time <br /> of subdivision approval or at the time of hook-up, whichever is first. <br /> Commercial/Industrial/Institutional availability charges shall be paid at the <br /> time of building permit. Fees are based on the number of sanitary access <br /> charge (SAC) units assigned by Metropolitan Council Environmental <br /> Services (MCES). <br /> City Water(CWAC) $1,532.00 Per SAC Unit. <br /> C. Surface Water Management Area Charges—Not Applicable <br /> The City established a trunk area charge to uniformly distribute the costs <br /> of public trunk surface water infrastructure and water quality <br /> improvements. The Surface Water Management Charge shall be based on <br /> developable acreage, in the amount specified in Exhibit C. <br /> Acres Fee <br /> 1. Sanitary Sewer Trunk Unit Fee ($1,695/unit; 2.92 units/Acre) $ <br /> 2. City Sewer Availability Fee ($1,586/SAC Unit) $ <br /> 3. Water Trunk Unit Fee ($2,435/unit; 2.92 units/Acre) $ <br /> 4. City Water Availability Fee ($1,532/SAC Unit) $ <br /> 5. City Surface Water Management Fee (/Acre) $ <br /> Total Estimated (Budget) Developer Fees $0.00 <br /> D. Metropolitan Council Environmental Services (MCES) Sewer Availability <br /> Charges (SAC) are in addition to the fees referenced above and shall be <br /> determined by MCES, and shall be paid with the Building Permit. <br /> IV. RECORD DRAWINGS. <br /> a. Upon project completion, Developer shall submit record drawings, in <br /> electronic format, of all public and private infrastructure improvements, <br /> including grading, sanitary sewer,water main, storm sewer facilities, and roads, <br /> constructed by Developer. The as-built survey must include, but is not limited <br /> to, proposed and final contours with adequate elevation shots to show <br /> conformance,property irons (to be exposed in field), low floor and low <br /> opening elevations, and the 100-Year High Water Level (HWL) of all ponds, <br /> lakes, and wetland areas. The files shall be drawn in Anoka County NAD 83 <br /> Coordinate system and provided in both AutoCAD .dwg and Adobe .pdf file <br /> formats. The plans shall include accurate locations,dimensions, elevations, <br /> grades, slopes and all other pertinent information concerning the complete work. <br /> The Developer shall also submit certified compaction testing results for the <br /> site grading operations. <br /> Glamos Wire,Inc. Site Performance Agreement page 4 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.