My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10-23-2023 Council Meeting Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2023
>
Searchable Packets
>
10-23-2023 Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2023 1:37:23 PM
Creation date
10/24/2023 1:35:25 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/23/2023
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
inspections, or both Actual Cost*** <br />Plan Review Fee <br />a. 65% of the Building Permit Fee <br />b. 25% of the Building Permit Fee for review of similar plans (Master Plan) in a 12 <br />month period <br />Easement Encroachment Fee County Recording Fee plus $25.00 <br />Antenna, City Owned Property 250.00$ Plus $6,000 Escrow <br />Antenna, Private Property See Building Fee Table <br />Accessory Building Permit: 200 sq. ft. or under in size 73.00$ <br />69.00$ <br />Accessory Building Permit: over 200 sq. ft. in size See Building Fee Table <br />Fence Permit: 6 feet or under in height 73.00$ <br />69.00$ <br />Fence Permit: over 6 feet in height See Building Fee Table <br />Grading Permit 160.00$ <br />Grading Permit Escrow Deposit (if not <br />included in Dev. Contract)300.00$ <br />Roofing Permit 106.00$ <br />Siding Permit 106.00$ <br />Swimming Pool Permit 160.00$ In Ground <br />106.00$ Above Ground <br />Window/Door Replacement Permit 79.00$ /Unit (max $158.00) <br />Retaining Wall Permit 73.00$ <br />69.00$ <br />Mechanical (HVAC) permit: Gas Fireplace 73.00$ Plus $34.50 for Each <br />Additional Fireplace <br />69.00$ Plus $34.50 for Each <br />Additional Fireplace <br />Mechanical (HVAC) Permit: Residential 73.00$ Except New Construction <br />Includes AC/Furnace Combined <br />69.00$ Except New Construction <br />Includes AC/Furnace Combined <br />Mechanical (HVAC) Fee: New Construction Residential 158.00$ Does Not Include Fireplaces <br />Mechanical (HVAC) Permit: Commercial 2% of the Contract Price ($73.00 $69.00 <br />Minimum Fee) <br />Manufactured Home Permits 250.00$ <br />Plumbing Permit 11.00$ /Fixture ($73.00 Min. Fee) <br />/Fixture ($69.00 Min. Fee) <br />Sewer Connection Inspection Fee 200.00$ <br />Water Connection Inspection Fee 250.00$ <br />Contractor License Verification 5.00$ /Permit <br />Contractor Lead Certification Verification 5.00$ /Permit <br />Contractor License 50.00$ <br />Metropolitan Council SAC (Sewer Availability Charge)Per Met Council <br />Water Meter City Cost plus $50.00 <br />MXU Unit City Cost plus $50.00 <br />Water Meter + MXU Unit City Cost plus $50.00 <br />Touch Pad 18.00$ <br />Curb Stop Covers 70.00$ <br />Septic Installation or Repair Permit 250.00$ <br />Septic Pumping Permit 10.00$ <br />Demolition Permit 73.00$ <br />69.00$
The URL can be used to link to this page
Your browser does not support the video tag.