My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11/08/2023 P & Z Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2023
>
11/08/2023 P & Z Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2023 2:38:21 PM
Creation date
11/3/2023 1:18:28 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
11/08/2023
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15 <br />• A goal of the Parks, Greenways & Trails Plan is to established greenway <br />corridors. A multi-functional greenway corridor incorporating stormwater <br />management, trails and open space is established with the development. <br />Summary <br /> <br />Public Benefit Gained: <br /> <br />1. Conservation development with a mix of residential house types on varying lot <br />sizes that protects and enhances the on-site natural resources such as wetlands, <br />woodlands, rare plant species, and open space that are accessible to the general <br />public. <br />2. Main-level living with association-maintain yards and snow removal which <br />addresses life-cycle housing <br />3. Preserved wetlands and established wetland buffers/conservation easements <br />4. Orderly transition from existing large lot single family neighborhood to smaller <br />single family detached lots <br />5. Efficient use of land resulting in smaller network of utilities and streets <br />6. Protection of Woolan Park wetland complex <br />7. Extension of sanitary sewer to eventually serve Olive and Orange Street <br />neighborhood currently served by on-site systems. <br />8. Establish multi-functional greenway corridor and trail system that is accessible to <br />the public. <br />9. More parkland dedication fees collected <br /> <br />Flexibility Provided: <br /> <br />1. Lot Sizes < 7,500 sf <br />2. Lot Widths < 60ft <br />3. Building Setbacks (street and side) <br />4. Garage sizes < 520sf <br />5. Garage forward of house <br />6. Length of garage wall > 50% structure facade <br /> <br />RECOMMENDATION <br /> <br />Staff is requesting feedback from the Planning & Zoning Board: <br /> <br />1. Are there other Benefits Gained or Flexibility Provided? <br />2. Thoughts on PUD flexibility for lot widths, lot sizes, setbacks and building & <br />garage design standards? <br />3. Should the applicant hold a neighborhood meeting prior to PUD Preliminary <br />Plan/Preliminary Plat submittal. <br />ATTACHMENTS <br /> <br />1. Site Location and Aerial Map
The URL can be used to link to this page
Your browser does not support the video tag.