My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11-06-2023 Council Work Session Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2023
>
Searchable Packets
>
11-06-2023 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 12:14:00 PM
Creation date
11/7/2023 10:12:38 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
11/06/2023
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY COUNCIL <br />WORK SESSION STAFF REPORT <br />ITEM NO. 7 <br />STAFF ORIGINATOR: Justin Williams, Public Works Superintendent <br />WORK SESSION DATE: November 6, 2023 <br />TOPIC: Utility Meter Reading Equipment and Customer Portal <br />______________________________________________________________________________ <br />BACKGROUND <br />Staff’s current operations to obtain quarterly meter readings are done in a drive-by fashion. A <br />radio signal is sent out to the MXU (Meter Transceiver Unit). The reading on the meter is <br />communicated from the meter to the MXU and back to the receiver in the truck and stored for <br />export into City utility billing software (Springbrook). Currently, the City does not offer any type <br />of customer portal with analytics to support how the customer is using water. <br />Staff is looking to implement a tower base station and antenna located at the Water Tower #3 <br />(1750 Birch Street) and custom portal. This will allow for 1200 MXU radios to be read on an <br />hourly basis, with the MXU communicating back to the base station every 4 hours. The <br />customer portal will allow every resident with a utility account to see their use on a monthly <br />basis. Once all MXU’s have been upgraded, the city can then reprogram the meters city-wide to <br />move from a 1,000-gallon resolution down to a 1-gallon resolution and allow the customer to <br />be in control of their water usage. The customer portal will have an app for ease of use. The city <br />will also be able to detect leaks after the meter. Toilets, sinks, and irrigation systems are all <br />common culprits of excessive water use and would be able to be detected with the <br />implementation of this system. <br />City staff will also benefit from implementation. Staff can expect to see reduced times to read <br />meters, increased accuracy in annual reporting to State agencies, provide customer <br />explanations on water bill concerns, and send updates to MXU’s and radios as updates become <br />available. <br />The funding source would be Sewer and Water Enterprise funds. Ongoing annual fees have <br />been budgeted in the Water Fund earmarked as Meter Technology Upgrades. Estimated total <br />project cost is $149,278. Annual fees of $28,871 are not to exceed 3% year over year. <br />318
The URL can be used to link to this page
Your browser does not support the video tag.