My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11-13-2023 Council Special Work Session Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2023
>
Searchable Packets
>
11-13-2023 Council Special Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2023 4:04:43 PM
Creation date
11/8/2023 2:24:08 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
11/13/2023
Council Meeting Type
Work Session Special
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> <br />CITY COUNCIL <br />SPECIAL WORK SESSION STAFF REPORT <br />ITEM NO. 1 <br /> <br />STAFF ORGINATOR: Michael Grochala, Community Development Director <br /> <br />DATE OF WORK SESSION: November 13, 2023 <br /> <br />TOPIC: CSAH 49 and CR J Streetscape Improvements. <br />______________________________________________________________________________ <br />BACKGROUND <br /> <br />As previously discussed the CSAH 49 (Hodgson Road) and CR J (Ash Street) intersection is <br />identified as a “Gateway” in the City’s 2040 Comprehensive Plan. Design of potential <br />intersection streetscape improvements were included in the City’s Gateway Design manual <br />being prepared by WSB. <br /> <br />The proposed improvements have been revised based on comments received at the October 2, <br />work session and from Anoka County. Changes include the following: <br /> <br />1. Replacement of the 2 - Type B monuments signs with one Type A sign in the northeast <br />corner of the Roundabout (RAB). <br />2. Decorative lighting included on CR J between Blanchard and east side of the former <br />Sadders property. <br />3. Removal of decorative stamped crosswalks. <br />4. Removal of bollards and banner poles from medians. <br /> <br />We have broken the project up into four separate components depending on location, <br />responsible party and funding source. <br /> <br />1. In road streetscape items. This includes all the decorative concrete work, water supply <br />to the RAB, conduit system for irrigation and power supply. This would be included in <br />the County’s roadway contract. The County is also considering installing the street light <br />bases as part of this. Estimated cost is $60,440.00. We have proposed that this be <br />shared 50/50 between City and Shoreview/Ramsey County. No determination has been <br />made on their participation yet. Absent participation this could be scaled back to <br />medians on CSAH 49, north of the RAB. <br /> <br />2. RAB Landscape. This includes plants, turf, ground cover and irrigation. Estimated cost <br />is $45,512.00. We are also proposing this cost be split. Lino would be responsible for <br />2
The URL can be used to link to this page
Your browser does not support the video tag.