Laserfiche WebLink
1 <br /> <br />CITY COUNCIL <br />SPECIAL WORK SESSION STAFF REPORT <br />ITEM NO. 1 <br /> <br />STAFF ORGINATOR: Michael Grochala, Community Development Director <br /> <br />DATE OF WORK SESSION: November 13, 2023 <br /> <br />TOPIC: CSAH 49 and CR J Streetscape Improvements. <br />______________________________________________________________________________ <br />BACKGROUND <br /> <br />As previously discussed the CSAH 49 (Hodgson Road) and CR J (Ash Street) intersection is <br />identified as a “Gateway” in the City’s 2040 Comprehensive Plan. Design of potential <br />intersection streetscape improvements were included in the City’s Gateway Design manual <br />being prepared by WSB. <br /> <br />The proposed improvements have been revised based on comments received at the October 2, <br />work session and from Anoka County. Changes include the following: <br /> <br />1. Replacement of the 2 - Type B monuments signs with one Type A sign in the northeast <br />corner of the Roundabout (RAB). <br />2. Decorative lighting included on CR J between Blanchard and east side of the former <br />Sadders property. <br />3. Removal of decorative stamped crosswalks. <br />4. Removal of bollards and banner poles from medians. <br /> <br />We have broken the project up into four separate components depending on location, <br />responsible party and funding source. <br /> <br />1. In road streetscape items. This includes all the decorative concrete work, water supply <br />to the RAB, conduit system for irrigation and power supply. This would be included in <br />the County’s roadway contract. The County is also considering installing the street light <br />bases as part of this. Estimated cost is $60,440.00. We have proposed that this be <br />shared 50/50 between City and Shoreview/Ramsey County. No determination has been <br />made on their participation yet. Absent participation this could be scaled back to <br />medians on CSAH 49, north of the RAB. <br /> <br />2. RAB Landscape. This includes plants, turf, ground cover and irrigation. Estimated cost <br />is $45,512.00. We are also proposing this cost be split. Lino would be responsible for <br />2