Laserfiche WebLink
Excavation Permit Fees <br />125.00$ <br />70.00$ /100 Lineal Feet plus Hole Fee <br />Obstruction Permit Fee <br />50.00$ Plus $0.50/ Lineal Foot <br />Plus $0.05/ Lineal Foot <br />Permit Extension Fee <br />Includes administration, recording & review 55.00$ <br />Delay Penalty <br />60.00$ <br />Degradation Fee <br />Degradation Fee Formula: <br />Degradation Fee: <br />UTILITY FEES <br />Water Utility Rates <br />Residential <br />Base Fee 20.00$ /Quarter/REU* <br />15.00$ /Quarter/REU* <br />Consumption Fee <br />0 - 20,000 Gallons 2.10$ /Thousand Gallons <br />2.02$ /Thousand Gallons <br />20,001 - 40,000 Gallons 2.34$ /Thousand Gallons <br />2.25$ /Thousand Gallons <br />40,001 - 80,000 Gallons 2.92$ /Thousand Gallons <br />2.81$ /Thousand Gallons <br />80,001 - 120,000 Gallons 3.51$ /Thousand Gallons <br />3.37$ /Thousand Gallons <br />Over 120,000 Gallons 4.09$ /Thousand Gallons <br />3.94$ /Thousand Gallons <br />Non-Residential <br />Base Fee 20.00$ /Quarter/REU* <br />15.00$ /Quarter/REU* <br />Consumption Fee <br />0 - 20,000 Gallons 2.10$ /Thousand Gallons <br />2.02$ /Thousand Gallons <br />This formula covers degradation for depreciation caused by intrusion into the right-of- <br />way. The depreciation applies to the original surface of the right-of-way and to the <br />overlays and seal-coats applied to the surface. The formula includes life expectancy <br />schedules for each and has an estimated cost per square yard based on the quality of the <br />right-of-way surface required for different levels of traffic. This formula creates a <br />degradation fee which is determined by the cost per square yard for street, overlay, and <br />seal-coat, multiplied by the depreciation schedule, multiplied by the area of the street <br />patch. <br />(cost per square yard for street overlay and seal-coat x depreciation schedule rates) x area <br />of street patch = degradation fee <br />Hole (includes administration, plan review, <br />inspection, testing and mapping) <br />Trench (includes administration, plan review, <br />inspection, testing & mapping) <br />Includes administration, recording, review & <br />inspection <br />For up to three days of non-completion and non- <br />prior notice before specified date. After three days <br />an additional charge of $10.00 per day will be <br />levied. <br />99