Laserfiche WebLink
Stormwater Management <br /> A stormwater management plan has been submitted and is being reviewed by the City <br /> Engineer. The following summary review is based upon the Stormwater Management <br /> Report. <br /> Existing Conditions <br /> Per the Stormwater Management Plan, the site drains mostly to the west, with small <br /> portions of the site draining to Arlo Lane to the north and Lois Lane to the south. <br /> Proposed Conditions <br /> Under the proposed conditions, there will be 8,135 square feet(0.19 acres) of new <br /> impervious surface. An infiltration basin will be constructed along the west and south <br /> perimeters of lot 3 to provide stormwater treatment and runoff rate control. <br /> Drainage under the proposed conditions will be similar to existing conditions, with runoff <br /> heading to the northwest corner with small amounts of runoff reaching Arlo and and Lois <br /> Lane. <br /> Stormwater Pollution Prevention <br /> The Grading, Drainage, and Erosion Control Plan calls for silt fence and a rock <br /> construction exit. Silt fence should extend along entire north perimeter. <br /> Flood Plain <br /> Site does not fall within the flood management zone. <br /> Shoreland District <br /> Site does not fall within the Shoreland District. <br /> Wetlands <br /> There are no wetlands indicated on this site in the Natonional Wetlands Inventory. No <br /> wetland impacts are proposed for this project. <br /> Greenway System, Parks and Trails <br /> The site is not part of the Greenway System. <br /> Alternative Urban Areawide Review (AUAR) Considerations <br /> The site is not within the 2005 I-35E Corridor AUAR environmental review boundary. <br /> 3 <br />