My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10-22 Council Ordinance
LinoLakes
>
City Council
>
City Council Ordinances
>
2022
>
10-22 Council Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2024 7:21:55 PM
Creation date
1/24/2024 1:17:19 PM
Metadata
Fields
Template:
City Council
Council Document Type
Ordinances
Meeting Date
01/09/2023
Council Meeting Type
Regular
Ordinance #
10-22
Ordinance Title
An Ordinance Amending Secion 1011 Relating to the Regulation of Stormwater, Erosion, and Sediment Control
Ordinance Summary
Stormwater, Erosion, and Sediment Control
Ordinance Date Passed
01/09/02023
Ordinance Date Published
01/17/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
take equivalent measures such as smaller basins , check dams , and vegetated buffer <br /> strips . <br /> 16 . Methods to be used for final stabilization of all exposed soil areas . <br /> 17 . Documentation that the project applicant has applied for the NPDES <br /> permit from the Minnesota Pollution Control Agency ( MPCA ) , when applicable . <br /> 18 . A stormwater pollution prevention plan for projects that require an NPDES <br /> permit . <br /> ( 4 ) Construction activity requirements . Any activity subject to a permit under this <br /> chapter must conform to the standards of the NPDES general permit regarding <br /> construction - site erosion and sediment control . <br /> ( 5 ) Inspections . ( See also § 1101 . 011 . ) <br /> ( a ) The applicant shall be responsible for inspection , maintenance and <br /> effectiveness of all erosion and sediment control measures until final soil stabilization is <br /> achieved . <br /> ( b ) The city may inspect the project site and require the applicant to provide <br /> additional erosion control measures as it determined conditions warrant . <br /> ( 6 ) Final stabilization . <br /> ( a ) Erosion and sediment control measures must be maintained until final <br /> vegetation and ground cover is established to a density of 70 % over the entire pervious <br /> surface area . <br /> ( b ) All temporary erosion and sediment control BMPs will be removed , by owner , <br /> after all disturbed areas have been permanently stabilized . <br /> ( Ord . 09 - 15 , passed 10 - 26 - 2015 ) <br /> § 1011 . 011 STORMWATER MANAGEMENT REQUIREMENTS . <br /> ( 1 ) Stormwater management. Apermit incorporating an approved stormwater <br /> management plan shall be required for all proposed land development activity including <br /> public linear projects , unless otherwise exempted in this chapter , which meets any or all <br /> of the following : <br /> ( a ) A development , redevelopment or reconstruction , except public linear <br /> projects , that creates or reconstructs 10 , 000 square feet or more of impervious surface , <br /> including smaller individual sites that are part of a common plan of development that <br /> may be constructed at different times . <br /> ( b ) A subdivision of an area exceeding one acre . This includes subdivision for <br /> single - family residential , multi - unit residential , commercial , industrial , or institutional <br /> development . <br /> ( c ) For public linear projects , a permit is required when one or more acres of <br /> impervious surface will be to- created or reconstructed 11070000 <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.