My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10-22 Council Ordinance
LinoLakes
>
City Council
>
City Council Ordinances
>
2022
>
10-22 Council Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2024 7:21:55 PM
Creation date
1/24/2024 1:17:19 PM
Metadata
Fields
Template:
City Council
Council Document Type
Ordinances
Meeting Date
01/09/2023
Council Meeting Type
Regular
Ordinance #
10-22
Ordinance Title
An Ordinance Amending Secion 1011 Relating to the Regulation of Stormwater, Erosion, and Sediment Control
Ordinance Summary
Stormwater, Erosion, and Sediment Control
Ordinance Date Passed
01/09/02023
Ordinance Date Published
01/17/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 . Maintenance . All settled materials from ponds , sumps , grit chambers , and <br /> other devices , including settled solids , shall be removed and properly disposed of once <br /> capacity is reduced by 30 % . <br /> 3 . Inspection . All private stormwater facilities must submit an as - built record <br /> plan of the facility and must provide documentation to the city of an inspection during <br /> construction , during the first year of operation , and at least once every five years <br /> thereafter . Private facilities are subject to city inspection at any time to ensure <br /> compliance . <br /> ( b ) Public stormwater facilities . <br /> 1 . Acceptance of publicly owned facilities . Before work under the permit is <br /> deemed complete , as - builts and certification must be submitted demonstrating at the <br /> time of final stabilization that the stormwater facilities conform to design specifications . <br /> A final inspection shall be required before the city accepts ownership of the stormwater <br /> facilities . <br /> 2 . Inventory of stormwater facilities . The city shall inventory and maintain a <br /> database for all public stormwater facilities within the city requiring maintenance to <br /> ensure compliance with this chapter . <br /> ( 3 ) Maintenance . The city shall perform maintenance of publicly owned stormwater <br /> facilities within the city as provided for in the local surface water management plan . <br /> ( Ord . 09 - 15 , passed 10 - 26 - 2015 ) <br /> 1011 . 013 PLAN REVIEW PROCEDURE . <br /> Plan review. The applicant shall not commence any construction activity subject to <br /> this chapter until the stormwater management plan and /or the grading , erosion and <br /> sediment control plan have been approved by the city . The submittal shall be processed <br /> in accordance with : <br /> - Ch . 1007 . 020 of city code as applicable & 9 ^ f + ho 7nnino nrrlir r� r+» in nr Ch Inl 1 of <br /> W AL r+ n %lo � Q %A PP in � hlo . City approval is contingent on issuance of all other permits <br /> required by the city or other agencies having jurisdiction on the project . The following <br /> standards shall apply to all developments within the city : <br /> ( 1 ) Plan approval. If the city determines that the stormwater management plan <br /> and /or the grading , erosion and sediment control plan meets the requirements of this <br /> chapter , the city shall issue a plan approval valid for a specified period of time that <br /> authorizes the land disturbance activity contingent on the implementation and <br /> completion of this plan . <br /> ( 2 ) Plan denial. If the city determines that the plan does not meet the requirements <br /> of this chapter , the city shall not issue plan approval for the land disturbance activity . <br /> This plan must be resubmitted for approval before the land disturbance activity begins . <br /> All land use and building permits shall be suspended until the developer has an <br /> approved ._. cr czfnr- mlArater for ESC or stormwater management . <br /> 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.