My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10-22 Council Ordinance
LinoLakes
>
City Council
>
City Council Ordinances
>
2022
>
10-22 Council Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2024 7:21:55 PM
Creation date
1/24/2024 1:17:19 PM
Metadata
Fields
Template:
City Council
Council Document Type
Ordinances
Meeting Date
01/09/2023
Council Meeting Type
Regular
Ordinance #
10-22
Ordinance Title
An Ordinance Amending Secion 1011 Relating to the Regulation of Stormwater, Erosion, and Sediment Control
Ordinance Summary
Stormwater, Erosion, and Sediment Control
Ordinance Date Passed
01/09/02023
Ordinance Date Published
01/17/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
design process to reduce impervious cover , conserve natural areas and use pervious <br /> areas to more effectively treat stormwater runoff and promote a treatment train <br /> approach to runoff management . <br /> WIN <br /> BIOPIC TRA TION. <br /> rerrneye ) nFatei vela erne, tt m , l h o � g4pnf � r� � r� ir� ftnn . _ _ A bioretention practice in which an <br /> underdrain is used . Typically , most of the water entering MIN the biofiltration practice enters <br /> the underdrain and is returned to the stormwater system , but some water infiltrates <br /> ( unless the BMP has an impermeable liner) or evapotranspires . The underdrain may be <br /> at or elevated above the bottom of the practice ( i . e . at the media - soil interface ) ._ <br /> BIORTTENTION. A soil and plant - based stormwater management best <br /> management practice( BMP ) used to filter runoff . <br /> BRIDGE. A road , path , railroad or utility crossing over a waterbody , wetland , ditch , <br /> ravine , road , railroad or other obstacle . <br /> BRIDGE SPAN . The clear span between the inside surfaces of a bridge ' s terminal <br /> supports . <br /> CHANNEL . A perceptible natural or artificial depression , with a defined bed and <br /> banks that confine and conduct water flowing either continuously or periodically . <br /> CONSTRUCTION ACTIVITY. Activities including clearing,,grading , and excavating , <br /> that result in land disturbance of equal to or greater than one acre , including the <br /> disturbance of less than one acre of total land area that is part of a larger common plan <br /> of development or sale if the larger common plan will ultimately disturb equal to or <br /> greater than one acre . This includes a disturbance to the land that results in a change in <br /> the topography , existing soil cover; ( both vegetative and nonvegetative ) , or the existing <br /> soil topography that may result in accelerated stormwater runoff that may lead to soil <br /> erosion and movement of sediment . Construction activity does not include a disturbance <br /> to the land of less than five acres for the purpose of routine maintenance performed to <br /> maintain the original line and grade , hydraulic capacity , and original purpose of the <br /> facility . Routine maintenance does not include activities such as repairs , replacement <br /> and other types of non - routine maintenance . Pavement rehabilitation that does not <br /> disturb the underlying soil e . g . , mill and overlay projects ) is not construction activity . <br /> . . <br /> . . <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.