Laserfiche WebLink
Culver’s Site Performance Agreement page 2 of 11 <br />building architectural design and building elements, site grading and <br />erosion control measures. <br /> <br />Such improvements shall be completed in accordance with Section IV <br />herein. <br /> <br />B. Cost Estimates. The Developer shall provide the City with a written <br />estimate of all applicable costs of the On-Site Work, itemized by type; the <br />estimates shall be based upon the actual estimates provided by the <br />contractors who are to do the Work. Said cost estimates shall be reviewed <br />by the City, and the City shall establish the actual amount of the financial <br />guarantee. The description and estimated cost of Developer's On-Site <br />Work are as follows: <br /> <br /> Description of Improvements Estimated Costs <br />1. Lighting $ 18,800.00 <br />2. Fences / Screen Structures $ 0.00 <br />3. Trash Disposal Structures $22,561.00 <br />4. Curbing / Islands / Delineators $ 41,240.00 <br />5. Storm Drainage Systems / Sewers / Catch Basins / <br />Culverts / Swales $35,400.00 <br />6. Public Trails and / or Sidewalk $ 0.00 <br />7. Private Trails and / or Sidewalk $ 11,200.00 <br />8. Driveway / Curb cut / Parking Lot / Fire Lane $ 86,190.00 <br />9. Water mains / Hydrants / Sanitary Sewers $ 47,950.00 <br />10. Landscaping $ 39,820.00 <br />11. Site Grading $88,900.00 <br />12. Erosion Control $6,870.00 <br /> Total Estimated Cost of Developer Improvements $398,931.00 <br /> Security Requirement (Total * 35%) $ 139,626.00 <br /> <br /> <br />III. DEVELOPER FEES. <br /> <br />A. Trunk Sanitary Sewer Connection Fees – Not Applicable <br />The City established trunk utility connection fees to uniformly distribute <br />the costs of public trunk sanitary sewer infrastructure. The Trunk Utility <br />Connection Fee consists of two components; a Trunk Charge and an <br />Availability Charge. <br /> <br />Trunk Charge <br /> <br />95