My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02-05-2024 Council Work Session Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2024
>
Searchable Packets
>
02-05-2024 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2024 4:18:25 PM
Creation date
2/1/2024 4:16:05 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
02/05/2024
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 <br /> <br />To: Katie Larsen <br />From: Andy Nelson <br />Date: 12/28/23 <br />Re: Environmental Comments/12-27-23/Jansen Addition Preliminary Plat <br />Environmental Board had the following comments at the 12/27/23 EB meeting: <br /> <br /> <br />1. Tree Protection Zones (TPZs) for the 25 trees scheduled for preservation must be <br />shown to scale on the Grading, Drainage, and Erosion Control Plan (Sheet C1.1 <br />and C1.2), and the Landscape Plan (Sheet L1). The TPZs must be in place prior <br />to issuance of grading permit and will be reviewed by staff concurrently with <br />inspection of sediment and erosion control measures. <br /> <br />2. Replace note on Grading, Drainage, and Erosion Control Plan about installing <br />“Perimeter Control Devices” for tree protection with “Tree Protection Fence <br />installed in accordance with City Tree Protection Fence Detail”. <br /> <br />3. The Landscape Plan (Sheet L1) note #3 mentions protecting trees to the dripline. <br />This statement must mention protecting trees in accordance with City Tree <br />Protection Fence Detail provided on Sheet C3.2. <br /> <br />4. The tree planting detail shall include comments about exposing root flare so it is <br />visibly at grade to ensure trees are installed at proper depth, and that mulch is <br />pulled back 3 inches from the trunk (mulch is not left touching the trunk). <br /> <br />5. 3 mitigation trees are required. These trees must be added to the Landscape Plan <br />(Sheet L1). <br /> <br />6. The boulevard tree shown for Lot 1 must be moved south into the right-of-way. <br /> <br />Environmental Memo <br />20
The URL can be used to link to this page
Your browser does not support the video tag.