My WebLink
|
Help
|
About
|
Sign Out
Home
Search
20240228 Enivronmental Board Packet Combined
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2024
>
20240228 Enivronmental Board Packet Combined
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2024 7:23:19 PM
Creation date
2/23/2024 2:11:36 PM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
02/28/2024
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL BOARD <br /> AGENDA ITEM 6A <br /> STAFF ORIGINATOR: Andy Nelson, Environmental Coordinator <br /> MEETING DATE: February 281h, 2024 <br /> REQUEST: 440 Park Court—Lino Lakes Tech Center and <br /> Storage Facility Conditional Use Permit and Site <br /> Plan Review <br /> APPLICANT: Lariat Companies, Inc. <br /> 8345 Crystal View Road, Suite 200 <br /> Eden Prairie, MN 55344 <br /> OWNER: Same. <br /> BACKGROUND <br /> The applicant, Lariat Companies, Inc., submitted a land use application for conditional <br /> use permit and site plan review. The development proposes a 36,000 sf multi-tenant <br /> industrial and indoor self-storage building on the south end of the site. The north end of <br /> the site is the existing Lino Lakes Storage. <br /> This staff report is based on a review of the following documents: <br /> • Applicant Narrative dated January 8, 2023 <br /> • Civil and Landscape Plan Set prepared by Elan Design Lab dated January 25, <br /> 2024 <br /> • Photometric Plan and Lighting Details prepared by AID Electric Corporation <br /> dated January 4, 2024 <br /> • ALTA/NSPS Land Title Survey prepared by E.G. Rud& Sons, Inc. dated January <br /> 26, 2024 <br /> • Stormwater Management Plan prepared by Elan Design Lab dated January 26, <br /> 2024 <br /> • Wetland Delineation Report prepared by Jacobson Environmental, PLLC dated <br /> May 11, 2023 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.