My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01-08-2018 Council Meeting Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2018
>
01-08-2018 Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2024 2:25:51 PM
Creation date
3/2/2024 11:44:46 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
01/08/2018
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />DRAFT 2040 Comprehensive Plan Update – Local Water Management Plan 32 <br />December 27, 2017 - Project CLL17010 <br />Action <br />No. Actions identified by Issue Category <br />Additional <br />Issue(s) <br />Addressed <br />Goals <br />Addressed <br />Policies <br />Addressed <br />Permitting and <br />Reporting 3.9.1 3.9.1A <br /> WETLAND MANAGEMENT <br />3 Implement Wetland Bank Plan. NA 3.3.1 3.3.1A <br />4 Provide for wetland impact replacement credit in cooperation with RCWD and VLAWMO NA 3.3.1 <br />3.3.1C <br />3.3.1D <br />3.3.1E <br />5 Conduct annual meeting with the RCWD to review wetland mitigation permits to ensure wetland functions are being preserved. <br /> NA 3.3.1 3.3.1E <br />6 Coordinate with MnDOT and County Transportation officials on projects that propose to disturb wetlands within their ROW by holding annual meeting to discuss future road <br />plans and wetland mitigation banking. NA 3.3.1 3.3.1A <br />7 Work with RCWD and VLAWMO to establish watershed-based approaches to maintaining or restoring wetland functions. <br /> <br />NA <br /> <br />3.3.1 <br /> <br />3.3.1D <br /> <br /> FLOODPLAIN MANAGEMENT <br />8 Review existing watershed models and work with the RCWD and VLAWMO to address flow constraints in the system. NA 3.4.1 3.4.1D <br /> PUBLIC DITCH SYSTEM <br />9 Work with the Rice Creek Watershed District on the ditch abandonment process for public subsurface (drain tile) systems and explore partial abandonment for surface (ditch) <br />systems, in cases where the public drainage system requires redesign to implement the Multi-Functional Greenway Corridor, NA 3.5.1 3.5.1A <br />10 <br />Support the RCWD in the RCWD’s implementation of ditch activities and Resource Management Plans by providing input where it impacts the city’s drainage system and <br />development plans by encouraging: <br />• Integrating management of ditch systems and adjacent wetland and upland systems; <br />• Maintaining ditch systems being used for agricultural benefit; <br />• Using branch maintenance in rural areas, retrofits in urbanizing areas and master planned communities with greenways and open space to reduce downstream flooding and retain <br />and reuse water in the local catchments; <br />• Minimizing future ditch maintenance costs by developing a self-sustaining design; <br />• Work with private landowners to retrofit/implement multi- functional greenway corridor, for those parcels that are not part of a Master Plan or are already developed. <br /> <br />NA 3.5.1 3.5.1A <br /> GROUNDWATER MANAGEMENT <br />11 Implement the wellhead protection plan to protect the groundwater source from contamination. NA 3.6.1 3.6.1C <br />12 Continue to implement the City’s Water Conservation Management Plan NA 3.6.1 3.6.1A <br /> NATURAL RESOURCES <br />13 Partner with RCWD, VLAWMO and MnDNR to establish program to educate residents on the means to identify and eradicate invasive species. NA 3.7.1 3.7.1A <br />14 Continue to manage and protect heron rookery and other important plant and animal communities. NA 3.7.1 3.7.1B <br />15 Develop, distribute and present public with information regarding the importance of shoreland buffers. NA 3.7.3 3.7.3C <br /> REGULATIONS, PERMITTING AND REPORTING <br />16 Implement Northeast Lino Lakes Comprehensive Stormwater Management Plan. Water Rate & <br />Quantity 3.1.1 3.1.1A <br />17 Resource Management System Plan through development of subwatershed management plans. The Plan will establish a clear vision of the multi-functional greenway corridor for <br />City Staff and developers and will be used as a tool early in the land development process. <br />Water Rate & <br />Quantity 3.1.1 3.1.1A <br />18 <br />Implement Resource Management System Plan through development of subwatershed management plans. The Plan will establish a clear vision of the multi-functional greenway <br />corridor for City Staff and developers and will be used as a tool early in the land development process. <br />Complete subwatershed management plans for the three highest priority RMUs: <br />1. Reshanau RMU <br />2. Marshan RMU <br />Water Quality 3.2.1 3.2.1D <br />Wetland Management 3.3.1 3.3.1D <br />Floodplain <br />Management 3.4.1 3.4.1B <br />Natural Resources 3.7.1 3.7.1A
The URL can be used to link to this page
Your browser does not support the video tag.