My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01-22-2018 Council Meeting Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2018
>
01-22-2018 Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2024 2:25:51 PM
Creation date
3/2/2024 12:01:22 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
All Seasons Rental <br />Development Agreement <br />January 22, 2018 <br /> page 7 <br />acres minus previously paid trunk fees for Lot 1 Block 1 Pine Glen (1.29 acres). The <br />total area for trunk charge is 0.9 acres. <br /> <br />Sanitary Trunk Charge : 2.92 Units * 0.9 Acres * $1,505.00 = $3,955.14 <br /> <br />Availability Charge <br /> <br />For residential properties, the availability charge shall be paid at the time of <br />subdivision approval or at the time of hook‐up, whichever is first. <br />Commercial/Industrial/Institutional availability charges shall be paid at the time <br />of building permit. Fees are based on the number of sanitary access charge <br />(SAC) units assigned by Metropolitan Council Environmental Services (MCES). <br /> <br />City Sewer (CSAC) $1,408.00 Per SAC Unit <br /> <br />Trunk sewer unit charges addressed under this paragraph are in addition to any <br />SAC charges imposed by Metropolitan Council Environmental Services. An <br />estimate of the total charge is specified in Exhibit C. <br />f. Trunk Water Connection Fees <br />The City established trunk utility connection fees to uniformly distribute the <br />costs of public trunk water infrastructure. The Trunk Utility Connection Fee <br />consists of two components; a Trunk Charge and an Availability Charge. <br />Trunk Charge <br /> <br />The trunk charge shall be paid at the time of subdivision approval or at the time of <br />hook‐up, whichever is first. The Water Trunk Charge is $2,162.00 per unit. <br />Commercial/Industrial/Institutional (CII) trunk charges are based on a factor of <br />2.92 units per acre. The area for trunk charge is equal to the total plat area 2.19 <br />acres minus previously paid trunk fees Lot 1 Block 1 Pine Glen (1.29 acres). The <br />total area for trunk charge is 0.9 acres. <br /> <br />Water Trunk Charge: 2.92 Units * 0.9 Acres * $2,162.00 = $5,681.74 <br /> <br />Availability Charge <br /> <br />For residential properties, the availability charge shall be paid at the time of <br />subdivision approval or at the time of hook‐up, whichever is first. <br />Commercial/Industrial/Institutional availability charges shall be paid at the time <br />of building permit. Fees are based on the number of sanitary access charge <br />(SAC) units assigned by Metropolitan Council Environmental Services (MCES).
The URL can be used to link to this page
Your browser does not support the video tag.