My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02-05-2018 Council Work Session Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2018
>
02-05-2018 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2024 2:25:51 PM
Creation date
3/2/2024 12:01:35 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Site 4 – Birch Street and West Shadow Lake Drive (School District Property) <br />- No borings completed at this time. The School District is not ready to make any <br />long-term commitments as they are determining their plans for the future. <br /> <br />With the potential elimination of Site 1, 3 and 4 staff is suggesting evaluation of 2 <br />additional sites pending City Council review: <br /> <br />Site 5 – Holly Drive and Holly Court (Privately Owned) - Existing 16” trunk <br />watermain exists on Holly Drive for potentially connecting to the proposed water <br />tower. This watermain would need to be extended southward along Holly Drive <br />N. to this site. A geotechnical analysis (soil borings and report) would be needed <br />to determine if structural pilings would be required at this site. <br /> <br />Site 6 – Country Lakes Park (City Property) New 16” trunk watermain would <br />need to be constructed along West Shadow Lake Drive from Birch Street to this <br />site. A geotechnical analysis (soil borings and report) would be needed to <br />determine if structural pilings would be required at this site. This site is located <br />within County Lakes Park. <br /> <br />The following table shows the estimated additional costs to construct a water tower at <br />each site: <br /> <br /> <br />Site Estimated <br />Additional Cost for <br />Land Purchase <br />(1-acre site) <br />Estimated <br />Additional Cost for <br />Trunk Watermain <br />($250/ft) <br />Estimated Total <br />Additional <br />Cost <br />(Not including <br />structural pilings if <br />needed) <br />1 (School District) $110,000.00 $25,000.00 $135,000.00 <br />2 (Fire Station) $0.00 $25,000.00 $25,000.00 <br />3 (Privately <br />Owned) <br />$110,000.00 $25,000.00 $135,000.00 <br />4 (School District) $110,000.00 $25,000.00 $135,000.00 <br />5 (Privately <br />Owned) <br />$110,000.00 $330,000.00 $440,000,00 <br />6 (Country Lakes <br />Park) <br />$0.00 $372,000.00 $372,000.00 <br /> <br />The advantages and disadvantages of each site are summarized below: <br /> <br />Site Advantages Disadvantages <br />1 (School District) Close to existing 16” trunk <br />watermain <br />Private property - Requires <br />negotiating with owner and land <br />purchase. <br />2 (Fire Station) City owned property. Close <br />to existing 16” trunk <br />watermain. <br />None
The URL can be used to link to this page
Your browser does not support the video tag.