My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02-05-2018 Council Work Session Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2018
>
02-05-2018 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2024 2:25:51 PM
Creation date
3/2/2024 12:01:35 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
35CNH ARCHITECTS <br />Low Cost <br />Public Works Facility <br />Sanitary Sewer and Water <br />9,707,342 <br />360,000 <br />10,067,342 <br />(2017 Dollars)Total $ <br />$ <br />$ <br />Option A1 <br />Remodel & Expansion <br />Phase 1 <br />Option A2 <br />New Facility at Existing Site <br />Phase 1 <br />Cost estimate <br />Option B1 <br />New Facility at Fire Station Site <br />Phase 1 <br />*Inflation not taken into account in this estimate <br />High Cost <br />Public Works Facility <br />Sanitary Sewer and Water <br />12,195,113 <br />360,000 <br />12,555,113(2017 Dollars)Total $ <br />$ <br />$ <br />Low Cost <br />Public Works Facility 10,040,359 <br />$ <br />$ <br />*Inflation not taken into account in this estimate <br />High Cost <br />Public Works Facility 12,458,171$ <br />Low Cost <br />Public Works Facility 9,922,715 <br />9,922,715 <br />(2017 Dollars)Total $ <br />$ <br />*Inflation not taken into account in this estimate <br />High Cost <br />Public Works Facility 12,380,093 <br />12,380,093 <br />(2017 Dollars)Total $ <br />$ <br />Sanitary Sewer and Water 360,000 <br />10,400,359 <br />(2017 Dollars)Total <br />$Sanitary Sewer and Water 360,000 <br />12,818,171(2017 Dollars)Total <br />$ <br />Cost Estimate Summary <br />The cost estimates shown above represent our teams professional opinion of probable construction cost based on the uses proposed, and typical <br />construction costs for similar facilities within the greater metropolitan area. The low cost to high cost range represents the preliminary level of the <br />designs done within this study, as well as the range in quality, life-cycle, and aesthetic choices that would be reviewed and selected by the city during <br />the design process. The costs, as indicated are current construction costs and an inflation factor would need to be applied when a specific time line <br />is developed. <br />The prices shown represent the estimated hard costs of the site and building construction shown in each option layout and vary only about $500,000 <br />when comparing the Low Cost for each option or 5% of the total cost. However, there are other cost factors not indicated that should also be taken <br />into consideration when comparing options that would create a greater final cost differential between options. A partial list of these items include: <br />• Operational cost to move Public Works functions off-site during construction for Site A options <br />• Loss of use of ball field and hockey rink at Site A if expansion occurs there <br />• Additional maintenance costs for reused portions of the existing structure under Option A1, <br />compared to an all-new facility in the other options <br />• Ability to continue to use one existing cold storage building under Option A2 and two existing <br />cold storage buildings under Option B1, thus postponing the date when Phase 2 of the Public <br />Works storage shown in each option layout would be needed
The URL can be used to link to this page
Your browser does not support the video tag.