My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02-05-2018 Council Work Session Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2018
>
02-05-2018 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2024 2:25:51 PM
Creation date
3/2/2024 12:01:35 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CNH ARCHITECTS <br />As the table indicates, the low end cost for a small addition of a scope that still allows for efficient <br />construction costs represents a construction cost of $1.65 million for a low-temperature heated open <br />plan storage addition. Conversely, if the population and equipment growth projections hit their most <br />aggressive levels represented in this study, the maximum addition cost would range from $3.3 million to <br />a high end of $4.5 million. As noted, these construction estimates are based on recent construction <br />costs for Public Works facilities of similar types and are listed in 2017 dollars. <br />Thank you for the opportunity to provide this additional data to better explain the study methodology <br />and the intended limitations of the future expansion cost ranges. <br />Best Regards <br />Quinn Hutson, AIA, LEED AP <br />Principal <br />CNH Architects, Inc.
The URL can be used to link to this page
Your browser does not support the video tag.