Laserfiche WebLink
Lake Dr Watermain Looping & Bituminous Trail, and Birch St Watermain Connection <br />City of Lino Lakes <br />Anoka County <br />Base Estimated Hours <br /> Engineering Graduate <br />Associate /Project Project Specialist Engineer 2-Person Office Total <br />Drilling Crew RLS Manager Engineer V IV Survey Crew Technician Hours Cost <br />Task Description <br />1 <br />A.Existing Conditions Base Map 4 6 10 1,430.00$ <br />B.Geotech Evaluation 8 4 4 2 18 2,538.00$ <br />C.Collect background data and private utility info 4 2 6 694.00$ <br />Subtotal 8 8 4 4 2 8 34 4,662.00$ <br />2 <br />A.Topographic Survey 10 10 1,720.00$ <br />Subtotal 10 10 1,720.00$ <br />3 <br />A.General Info Letter, Field Title Report, Min Damange Report 6 42 16 5 10 79 11,164.00$ <br />B.Offer Negotiations 4 4 2 10 1,454.00$ <br />C.Sub Consultant - Title Work O & E Reports 750.00$ <br />Subtotal 10 46 16 5 12 89 13,368.00$ <br />4 <br />A.Final Plans <br />1.Title Sheet 1 2 3 417.00$ <br />2.Removals/Demolition Plan 1 2 2 5 607.00$ <br />3.Construction Plans 4 2 2 40 48 6,298.00$ <br />4 Standard Details 1 2 2 2 4 11 1,330.00$ <br />5 Traffic Control/Detour Plan 1 2 1 2 6 740.00$ <br />6 Quantity Take Off 1 2 2 4 2 11 1,320.00$ <br />7 Wetland Delineation Ditch at Lake Dr 10 4 4 6 24 3,008.00$ <br />B.SWPPP Plan -$ <br />1.Prepare Plan 2 2 274.00$ <br />2.Prepare report 2 2 252.00$ <br />C.Bidding Administration -$ <br />1.Construction Specifications 4 2 2 10 18 1,962.00$ <br />2.Advertise bids 2 2 4 474.00$ <br />3.Create/Distribute Bid Package 1 1 2 8 12 1,243.00$ <br />4.Respond to RFIs from prospective bidders 1 2 2 4 9 963.00$ <br />5.Project Meetings 1 1 2 2 6 673.00$ <br />6.Bid Opening/Tabulate results 1 1 1 3 389.00$ <br />7.Letter of Award recommendation to City 1 2 3 340.00$ <br />8 Prepare Notice of Award and Contract 2 2 188.00$ <br />Subtotal 7 24 29 15 36 58 169 20,478.00$ <br />5 *Special Services are categorized as pass through items <br />A.Permits <br />1 RCWD Watershed District 2 6 2 10 1,124.00$ <br />2 Anoka County Right of Way x2 3 3 282.00$ <br />3 MDH Watermain Extension 2 2 188.00$ <br />Subtotal 2 11 2 15 1,594.00$ <br />Total Hours 8 25 72 44 35 38 5 80 307 <br />Hourly Costs 160.00 152.00 143.00 94.00 126.00 95.00 172.00 137.00 <br />Total Direct Labor Costs $1,280.00 $3,800.00 $10,296.00 $4,136.00 $4,410.00 $3,610.00 $860.00 $10,960.00 <br />TOTAL PROJECT COST 39,352.00$ <br />Budgeted Hours <br />Special Services* <br />Preliminary Design <br />Topographic Survey <br />Design <br />Acquisition Services 5 parcels