My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04-09-2018 Council Meeting Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2018
>
04-09-2018 Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2024 2:25:52 PM
Creation date
3/2/2024 12:02:54 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> <br />1. The urban subdivision must be located within the Metropolitan Urban Service Area <br />(MUSA) or the staged growth area as established by the city's Comprehensive Plan; <br />2. The cost of utilities and street extensions must be covered by one or more of the <br />following: <br /> a. An immediate assessment to the proposed subdivision; <br />b. One hundred percent of the street and utility costs are privately financed by the <br />developer; <br />c. The cost of regional and/or oversized trunk utility lines can be financed with available <br />city trunk funds; and <br />d. The cost and timing of the expenditure of city funds are consistent with the city's <br />capital improvement plan. <br />3. The cost, operation and maintenance of the utility system are consistent with the normal <br />costs as projected by the water and sewer rate study; and <br />4. The developer payments will offset additional costs of utility installation or future <br />operation and maintenance. <br /> <br />Main Street Shoppes 2nd Addition is consistent with infill policies. The development is within <br />the current Utility Staging Area 1A=2008-2015. The cost of utility and private drive <br />extensions are being privately financed by the developer. The cost, operation and <br />maintenance of the utility system are consistent with the normal costs projected by the water <br />and sanitary system plans. No future utility costs are proposed. <br /> <br />(c) Roads or highways to serve the subdivision. A proposed subdivision shall meet the <br />following requirements for level of service (LOS), as defined by the Highway Capacity <br />Manual: <br />1. If the existing level of service (LOS) outside of the proposed subdivision is A or B, <br />traffic generated by a proposed subdivision will not degrade the level of service more than <br />one grade; <br />2. If the existing LOS outside of the proposed subdivision is C, traffic generated by a <br />proposed subdivision will not degrade the level of service below C; <br />3. If the existing LOS outside of the proposed subdivision is D, traffic generated by a <br />proposed subdivision will not degrade the level of service below D; <br />4. The existing LOS must be D or better for all streets and intersections providing access <br />to the subdivision. If the existing level of service is E or F, the subdivision developer must <br />provide, as part of the proposed project, improvements needed to ensure a level of service <br />D or better; <br />5. Existing roads and intersections providing access to the subdivision must have the <br />structural capacity to accommodate projected traffic from the proposed subdivision or the <br />developer will pay to correct any structural deficiencies; <br />6. The traffic generated from a proposed subdivision shall not require city street <br />improvements that are inconsistent with the Lino Lakes capital improvement plan. <br />However, the city may, at its discretion, consider developer-financed improvements to <br />correct any street deficiencies; <br />7. The LOS requirements in divisions (2)(c)1. to 4. above do not apply to the I-35W/Lake <br />Drive or I-35E/Main St. interchanges. At city discretion, interchange impacts must be <br />evaluated in conjunction with Anoka County and the Minnesota Department of <br />Transportation, and a plan must be prepared to determine improvements needed to resolve <br />deficiencies. This plan must determine traffic generated by the subdivision project, how <br />this traffic contributes to the total traffic, and the time frame of the improvements. The plan
The URL can be used to link to this page
Your browser does not support the video tag.