My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06-11-2018 Council Meeting Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2018
>
06-11-2018 Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2024 2:25:53 PM
Creation date
3/2/2024 12:05:32 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 <br /> <br />Public water, sanitary and storm sewer utilities will be installed within the development. <br />Sanitary Sewer <br /> <br />A 21” trunk sanitary sewer main located along CSAH 14 (Main Street) serves the site. An 8” <br />and 10” sanitary sewer pipe serves the site internally. Future development to the north will <br />potentially require a lift station. Sanitary sewer will also be stubbed to the west to <br />accommodate future development. <br /> <br />Watermain <br /> <br />A 12” trunk watermain located along CSAH 14 (Main Street) serves the site. An 8” and 16” <br />watermain serve the site internally and loops the system to CSAH 14 (Main Street). Watermain <br />will be stubbed to the west and north property boundaries for future development. <br /> <br />Public Land Dedication <br /> <br />The City will require cash in lieu of land dedication. Per the City’s Park, Greenway & Trail <br />System Plan, a neighborhood park is not programmed for this area. Lino Lakes Elementary <br />School is immediately adjacent to the development and provides a joint-use opportunity <br />between the city and school for shared use of facilities. <br /> <br />Nature’s Refuge <br />62 lots x $3,000 = $186,000 <br /> <br />The Park, Greenway & Trail System Plan does identify the need for a future city trail running <br />north-south through the development along greenway corridor. The revised plans show an 8.5 <br />feet wide paved trail along the greenway corridor and Street C consistent with the Trail System <br />Plan. Due to concerns regarding potential impacts to the rare plant species behind Lots 1-4, <br />Block 5, staff recommends the trail corridor be constructed on the west side of the <br />development along Pond 100 and 200 utilizing the maintenance access path. <br /> <br />Outlot C of the revised plans accommodates a 25 foot wide trail corridor as required in the <br />original review comments. Staff and the applicant will further evaluate whether a 25 foot wide <br />outlot or trail easement will be required. <br /> <br />Plans have been revised to include a 10 foot wide trail along CSAH 14 (Main Street). The <br />timing of this trail construction is to be determined based on available funds. The section of <br />sidewalk extending along Street A from Main Street to Street B shall also be revised to be an <br />8.5 foot wide trail. <br /> <br />Credit will be given for trail and boardwalk construction. <br /> <br />The Park Board reviewed the plans on February 5, 2018. The Board recommends collecting <br />park fees to potentially fund enhancements at Lino Lakes Elementary School. The trail <br />connection could occur behind Lot 12, Block 3 and the trail could be eliminated behind Lots <br />13-16, Block 3. A paved trail along Main Street is required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.