Laserfiche WebLink
17 <br />PUD Flexibility Summary <br />•Street A & C <br />•Reduce ROW from 80’ to 60’ <br />•Reduce front setback from <br />40’ to 30’ <br />•Street D & E (cul de sacs) <br />•Reduce road width from 32’ <br />to 28’ <br />•Street E <br />•Reduce ROW from 60’ to 50’ <br />•TBD with trail relocation <br />•Block 1, Lots 1-5 <br />•Reduce front setback from <br />30’ to 25’ <br />•Block 5, Lots 1-4 <br />•Reduce lot depth from 135’ <br />to 120-125 ‘ <br />•Landscaping in D&U OL E & F <br />A <br />C <br />E <br />D <br />Block 5 <br />Block 1 <br />Lot 23 & 24