My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06-25-2018 Council Meeting Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2018
>
06-25-2018 Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2024 2:25:53 PM
Creation date
3/2/2024 12:06:54 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CITY COUNCIL <br />AGENDA ITEM 6C <br /> <br /> <br />STAFF ORIGINATOR: Diane Hankee PE, City Engineer <br /> <br />MEETING DATE: June 25, 2018 <br /> <br />TOPIC: Resolution No. 18-77, Accepting Quotes and Awarding a <br />Construction Contract, 2018 Street Maintenance (Reclamite) <br />Project <br /> <br />VOTE REQUIRED: 3/5 Vote Required <br /> <br /> <br />INTRODUCTION <br /> <br />Staff is requesting Council authorization to accept quotes and award the construction contract <br />for a 2018 Street Maintenance (Reclamite) Project. <br /> <br />BACKGROUND <br /> <br />As part the City’s annual street maintenance program quotes were received to complete a <br />maltene-based asphalt rejuvenator project. Enclosed is project location map. The maltene-based <br />asphalt rejuvenator product is recommended in lieu of the traditional seal coat. It is a product <br />that many metro area Cities are using to avoid delamination. The project budget is $90,000.00. <br /> <br />Quotes were received for the above-referenced project on June 18, 2018. <br /> <br />CONTRACTOR TOTAL QUOTE <br />Corrective Asphalt Materials $87,730.80 <br />Lino Lakes Blacktop Did not Quote <br />Allied Blacktop Did not Quote <br />Arcade Asphalt Did not Quote <br /> <br />The low quote was submitted by Corrective Asphalt Materials, LLC., South Roxana, IL, in the <br />amount of $87,730.80. The completion date for this project is August 30, 2018. <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.