My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06-25-2018 Council Meeting Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2018
>
06-25-2018 Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2024 2:25:53 PM
Creation date
3/2/2024 12:06:54 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Comments: <br /> <br />1.The applicant shall loop the system along the west side of Lot 25 Block 4 from Street C <br />to Main Street. Watermain loop added. <br />The watermain on L1B8 shall be located (moved east) under the trail in the outlot <br />verses in an easement on the west side of the lot. <br />2.The applicant shall install 16 inch diameter trunk watermain from Main Street north <br />through the development. Along west side of Lot 25 Block 4 and to the north extents of <br />Street C. Trunk oversizing credits will apply. Watermain sizing updated. <br />3.Watermain shall be extended north along Street C under ACD 10-22-32. <br />Watermain extended to the northern property line. <br /> <br />• Sanitary Sewer <br />There is an existing 21 inch diameter trunk sanitary sewer located along CSAH 14 (Main <br />Street). The Nature’s Refuge development is proposed to be served by extending 8-inch <br />diameter PVC sanitary sewer throughout the development from an existing sanitary sewer <br />manhole in Main Street (CSAH 14) just south of Outlot E, and installing 4-inch diameter <br />Schedule 40 PVC services. The City’s Comprehensive Plan requires that the sanitary system <br />serves the future lift station and forcemain of Sanitary Sewer Sub-District 2K, discharging <br />to the northernmost proposed manhole in Street C. <br /> <br />Comments: <br /> <br />1.The applicant shall increase the mainline sanitary sewer in Street C and D to 10 inch <br />diameter at minimum grade 0.28%. Trunk oversizing credits will apply. <br />Sanitary sewer sizing updated. <br />2.The existing sanitary sewer stub at Main St and Street A shall be properly abandoned <br />and plugged at the Manhole. Note added to abandon. <br />3.The applicant shall add a note that sanitary services require the contractor to provide X, <br />Y and Z GPS coordinates of wyes and service ends for future locating requirements. <br />This will be noted on final construction plans. <br />4.The applicant shall add a note that sanitary sewer pipe be installed with a tracer wire. A <br />tracer wire box shall be provided at the surface for the ends of the sanitary sewer service <br />tracer wire to provide access to wire ends for future locating requirements. <br />This will be noted on the final construction plans. <br />5.Sanitary Sewer shall be extended north along Street C under ACD 10-22-32. <br />Sanitary sewer extended to the northern property line. <br />6.Sanitary Sewer shall be extended west along Street C from the most westerly manhole to <br />the same extent as the watermain. Sanitary stub added. <br /> <br />• Transportation <br /> <br />The Nature’s Refuge subdivision is proposed on the north side of Main Street (CSAH 14) <br />between Lake Drive (CSAH 23) and 4th Avenue. Access will be from a new street <br />connection (Street A) to Main Street (CSAH 14). The development will be set for future <br />extensions to the west, north, and to Lino Lakes Elementary. To improve access control on <br />Main Street, the City is working with School to remove their west access and connect to <br />Nature’s Refuge.
The URL can be used to link to this page
Your browser does not support the video tag.