My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-27-2018 Council Meeting Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2018
>
08-27-2018 Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2024 2:39:09 PM
Creation date
3/2/2024 12:08:06 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/27/2018
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Love to Grow On Site Performance Agreement page 2 of 10 <br />building architectural design and building elements, site grading and <br />erosion control measures. <br /> <br />Such improvements shall be completed in accordance with Section IV <br />herein. <br /> <br />B. Cost Estimates. The Developer shall provide the City with a written <br />estimate of all applicable costs of the On-Site Work, itemized by type; the <br />estimates shall be based upon the actual estimates provided by the <br />contractors who are to do the Work. Said cost estimates shall be reviewed <br />by the City, and the City shall establish the actual amount of the financial <br />guarantee. The description and estimated cost of Developer's On-site <br />Work are as follows: <br /> <br /> Description of Improvements Estimated Costs <br /> <br />1. Lighting $ 8,750.00 <br />2. Fences / Screen Structures $30,750.00 <br />3. Trash Disposal Structures $30,000.00 <br />4. Curbing / Islands / Delineators $18,915.00 <br />5. Storm Drainage Systems / Sewers / Catch Basins / <br />Culverts / Swales <br />$67,710.00 <br />6. Public Trails and / or Sidewalk $ 2,000.00 <br />7. Private Trials and / or Sidewalk $18,375.00 <br />8. Driveway / Curb cut / Parking Lot / Fire Lane $50,000.00 <br />9. Water mains / Hydrants / Sanitary Sewers $46,575.00 <br />10. Landscaping $33,203.00 <br />11. Site Grading $23,873.00 <br />12. Erosion Control $ 4,200.00 <br /> Total Estimated Cost of Developer Improvements <br /> <br />$334,351.00 <br /> Security Requirement (Total * 35%) $117,023.00 <br /> <br />III. DEVELOPER FEES <br /> <br />A. Trunk Sanitary Sewer Connection Fees <br />The City established trunk utility connection fees to uniformly distribute <br />the costs of public trunk sanitary sewer infrastructure. The Trunk Utility <br />Connection Fee consists of two components; a Trunk Charge and an <br />Availability Charge. <br /> <br />Trunk Charge <br /> <br />The trunk charge shall be paid at the time of subdivision approval or at the <br />time of hook-up, whichever is first. The Sanitary Sewer Trunk Charge is
The URL can be used to link to this page
Your browser does not support the video tag.