Laserfiche WebLink
Love to Grow On Site Performance Agreement page 4 of 10 <br />improvements. The Surface Water Management Charge shall be based on <br />developable acreage. <br /> <br /> Fee <br />1. Sanitary Sewer Trunk Unit Fee ($1,505/unit; 2.92 <br />units/Acre) <br />1.84ac *$ 0.00 <br />2. City Sewer Availability Fee ($1,408/SAC Unit) 16 units $22,528.00 <br />3. Water Trunk Unit Fee ($2,162/unit; 2.92 units/Acre) 1.84ac *$ 0.00 <br />4. City Water Availability Fee ($1,360/SAC Unit) 16 units $21,760.00 <br />5. City Surface Water Management Fee ($10,225/Acre) 1.84 *$ 0.00 <br /> Total Developer Fees $44,288.00 <br /> <br />*Paid with original development agreement for Millers Crossroads <br /> <br />IV. RECORD DRAWINGS <br /> <br />a. Upon project completion, Developer shall submit record drawings, in <br />electronic format, of all public and private infrastructure improvements, <br />including grading, sanitary sewer, water main, storm sewer facilities, and roads, <br />constructed by Developer. The as-built survey must include, but is not limited <br />to, proposed and final contours with adequate elevation shots to show <br />conformance, property irons (to be exposed in field), low floor and low <br />opening elevations, and the 100-Year High Water Level (HWL) of all ponds, <br />lakes, and wetland areas. The files shall be drawn in Anoka County NAD 83 <br />Coordinate system and provided in both AutoCAD .dwg and Adobe .pdf file <br />formats. The plans shall include accurate locations, dimensions, elevations, <br />grades, slopes and all other pertinent information concerning the complete work. <br />The Developer shall also submit certified compaction testing results for the <br />site grading operations. <br />b. A summary of the record plan attribute data for the storm sewer, water main, <br />and sanitary sewer structures and pipes shall be submitted in the form of an <br />Excel Spreadsheet as provided by the City Engineer. <br />c. No securities will be fully released until all record drawings have been <br />submitted and accepted by the City Engineer. <br />IV. COMPLETION DATE. <br /> <br />If the activities authorized by site and building plan approval are not initiated <br />within twelve (12) months from the final execution of this agreement, then <br />Developer will need to start the site and building plan approval process from <br />the beginning. <br />