My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/10/2024 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2024
>
04/10/2024 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2024 9:34:10 AM
Creation date
4/5/2024 9:33:19 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
04/10/2024
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> <br /> b. Industrial and warehouse buildings, multi-tenant office/industrial/warehouse or <br />showroom/warehouse or other combinations. At least 75% of all each exterior wall finishes shall <br />be composed of at least two different class 1 or 2 materials. Class 3 materials shall not comprise <br />more than 25% of the building each exterior wall. <br /> <br /> c. To be counted as a primary material, the product must comprise at least 5% of the <br />exterior wall surface. <br /> <br /> 17. For the purposes of this section, the area of each exterior wall shall not include area devoted <br />to garage doors, window trim, and flashing shall not constitute required materials that make up <br />exterior finish of a building for purposes of this section. <br /> <br />RECOMMENDATION <br /> <br />Staff requests input from the Board regarding the proposed zoning ordinance text amendments. <br /> <br />ATTACHMENTS <br /> <br />1. None <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.