My WebLink
|
Help
|
About
|
Sign Out
Home
Search
Resolution 24-029
LinoLakes
>
City Council
>
City Council Resolutions
>
2024
>
Resolution 24-029
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 9:45:33 AM
Creation date
4/9/2024 9:45:25 AM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
04/08/2024
Council Meeting Type
Regular
Resolution #
24-29
Resolution Title
Approving Amendment No, 1 to the Joint Powers Agreement for Improvements at the Intersection of CSAH 49 and Anoka Couty CSAH 32/Ramsey County CSAH 1 in the Cities of Lino Lakes, MN and Shoreview, MN
Resolution Summary
JP Amendment for CSAH 49/County Road J intersection improvement
Resolution Date Passed
04/08/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Anoka County Contract No.C0009260 <br /> EXHIBIT "C" <br /> FOR PROJECTS CONSTRUCTED IN ANOKA COUNTY <br /> ITEMS COUNTY SHARE CITY SHARE <br /> Concrete Curb&Gutter 50% 50% <br /> Concrete Curb&Gutter for Median and Center Island Construction 100% 0% <br /> Concrete Median 100% 0*' <br /> Concrete Sidewalk 0% 100% <br /> Concrete Sidewalk Replacement 100% 0% <br /> Bikeways 0% 100% <br /> Bikeway Replacement 100%, 0% <br /> Unless existing trail not placed at edge of R/W <br /> Construction or Adjustment of Local Utilities 0% 100% <br /> Grading, Base and Bituminous 100% 0% <br /> Storm Sewer based on state aid letter*2 based on state aid letter*2 <br /> Driveway Upgrades 100%, in-kind 100%, of up-grades <br /> Traffic Signals, new (communities larger than 5,000) %the cost of its the cost of its legs of <br /> w/State Aid approved SJR legs of the intersection the intersection plus <br /> the cost of the County legs <br /> of the intersection <br /> Traffic Signals, replacement(communities larger than 5,000) the cost of its legs of the cost of its legs of <br /> w/State Aid approved SJR the intersection the intersection <br /> Traffic Signals, new&replacements(communities less than 5,000) 100% 0% <br /> w/State Aid approved SJR <br /> Traffic Signal,w/o State Aid approved SJR 0% 100% <br /> EVP 0% 100% <br /> Engineering Services *3 *3 <br /> Right-of-Way 100%*4 0% <br /> Street Lights 0% 100% <br /> Noise Walls 100%, if not previously notified*5 100%, if previously notified.5 <br /> *1 The County pays for 100%of Standard Median Design such as plain concrete. If a local unit of government requests decorative <br /> median such as brick,stamped concrete,or landscaping,the local unit will pay the additional cost above the cost of standard <br /> median. <br /> *2 In the event no State Aid is being used,or in the event the state aid letter does not determine cost split percentages,drainage cost <br /> shares will be computed by the proportion of contributing flow outside the County right of way to the total contributing flow. <br /> *3 Engineering shall be paid by the Lead Agency except that any participating agency will pay construction engineering in the amount <br /> of 8%of the construction costs paid by that agency. <br /> *4 In the event that the Township or City requests purchase of right-of-way in excess of those rights-of-way required by County <br /> construction,the Township or City participates to the extent an agreement can be reached in these properties. For instance,a <br /> Township or City may request a sidewalk be constructed alongside a County roadway which would require additional right-of-way,in <br /> which case the Township or City may pay for that portion of the right-of-way. Acquisition of right-of-way for new alignments shall be <br /> the responsibility of the Township or City in which the alignment is located. This provision may be waived by agreement with the <br /> County Board if the roadway replaces an existing alignment and the local unit of government takes jurisdiction of that existing <br /> alignment. In addition,any costs,including right-of-way costs,incurred by the County because a Township or City did not acquire <br /> sufficient right-of-way during the platting process or redevelopment process as requested by the County shall be paid by the <br /> Township or City. <br /> *5 Notification includes any letter to the agency indicating that noise will potentially be an issue in the future,likely received during the <br /> Plat Review Process. Maintenance shall be the responsibility of the agency paying for the initial installation. When the County is the <br /> responsible agency,it shall pay 100%of Standard Noise Wall Cost. If a local agency requests decorative noise walls,the <br /> requesting agency will pay the additional cost above the cost of standard noise wall. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.