My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04-22-2024 Council Meeting Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2024
>
Searchable Packets
>
04-22-2024 Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2024 3:00:29 PM
Creation date
5/14/2024 2:54:58 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
04/22/2024
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lino Lakes Tech Center & Storage Facility Site Performance Agreement page 4 of 11 <br />Services (MCES). <br /> <br />City Water (CWAC) $1,570.00 Per SAC Unit <br /> <br />C. Surface Water Management Area Charges <br /> <br />The City established a trunk area charge to uniformly distribute the costs <br />of public trunk surface water infrastructure and water quality <br />improvements. The Surface Water Management Charge shall be based on <br />developable acreage. <br /> <br /> Acre Fee <br />1. Sanitary Sewer Trunk Unit Fee ($1,737/unit; 2.92 units/Acre) Paid <br />2. City Sewer Availability Fee ($1,626/SAC Unit) Due w/ Building <br />Permit <br />3. Water Trunk Unit Fee ($2,496/unit; 2.92 units/Acre) Paid <br />4. City Water Availability Fee ($1,570/SAC Unit) Due w/ Building <br />Permit <br />5. City Surface Water Management Fee (/Acre) Paid <br /> Total Estimated (Budget) Developer Fees $0.00 <br /> <br />D. Metropolitan Council Environmental Services (MCES) Sewer Availability <br />Charges (SAC) are in addition to the fees referenced above and shall be <br />determined by MCES, and shall be paid with the Building Permit. <br /> <br />IV. RECORD DRAWINGS <br /> <br />A. Upon project completion, Developer shall submit record drawings, in <br />electronic format, of all public and private infrastructure improvements, <br />including grading, sanitary sewer, water main, storm sewer facilities, and <br />roads, constructed by Developer. The as-built survey must include, but is <br />not limited to, proposed and final contours with adequate elevation shots <br />to show conformance, property irons (to be exposed in field), low floor <br />and low opening elevations, and the 100-Year High Water Level (HWL) <br />of all ponds, lakes, and wetland areas. The files shall be drawn in Anoka <br />County NAD 83 Coordinate system and provided in both AutoCAD .dwg <br />and Adobe .pdf file formats. The plans shall include accurate locations, <br />dimensions, elevations, grades, slopes and all other pertinent information <br />concerning the complete work. The Developer shall also submit certified <br />compaction testing results for the site grading operations. <br />B. A summary of the record plan attribute data for the storm sewer, water <br />main, and sanitary sewer structures and pipes shall be submitted in the <br />form of an Excel Spreadsheet as provided by the City Engineer. <br />138
The URL can be used to link to this page
Your browser does not support the video tag.