Laserfiche WebLink
4 <br />Site & Building Plan Review <br />•Access to Phase II through the <br />Phase I mini self-storage private <br />driveways. <br />•No access Lake Dr. allowed. <br />•Setbacks are met <br />•Lake Dr = 50ft <br />•Park Ct = 30ft <br />•40 parking stalls required <br />•31 parking spaces + <br />•11 proof of parking provided <br />•Stormwater Management <br />•New infiltration basin <br />•12” watermain exists Park Ct <br />•8” sanitary sewer installed Lake Dr <br />•Impervious Surface: <br />•3.39ac proposed < 3.98 ac allowed <br />Proof of <br />Parking <br />New <br />SW <br />Pond <br />Existing <br />SW Pond