My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05-28-2024 Council Meeting Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2024
>
Searchable Packets
>
05-28-2024 Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2024 3:21:52 PM
Creation date
5/24/2024 3:17:15 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
05/28/2024
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY COUNCIL <br />REGULAR MEETING STAFF REPORT <br />AGENDA ITEM 6B <br />STAFF ORIGINATOR: <br />MEETING DATE: <br />TOPIC: <br />Diane Hankee, City Engineer <br />May 28, 2024 <br />Ordinance No. 08-24, Vacating Drainage & Utility <br />Easement, 6590 12th Avenue <br />i.Consider 2nd Reading of Ordinance No. 08-24, <br />ii.Consider Resolution No. 24-55, Approving Summary <br />Publication of Ordinance No. 08-24 <br />VOTE REQUIRED: 4/5 <br />_____________________________________________________________________________ <br />INTRODUCTION <br />Staff is requesting City Council consideration of the 2nd Reading of Ordinance No. 08-24, <br />vacating Drainage and Utility easement, Water Treatment Plant (6590 12th Avenue). <br />BACKGROUND <br />The Water Treatment Plant (6590 12th Avenue) parcel was purchased by the City in 2023 for <br />the purpose of constructing a new Water Treatment Plant that would be located near the <br />City’s existing transmission lines and municipal water supply wells. <br />The site has an existing drainage and utility easement that was dedicated to the City of Lino <br />Lakes in 1991 for the purpose of extending sanitary sewer and watermain to serve <br />development to the east. With the Water Treatment Plant project the sanitary sewer and <br />watermain will be re-routed and the Water Treatment Plant building will be constructed in the <br />center of the site. The easement will no longer be needed. <br />The Drainage and Utility Easement Vacation Description Sketch prepared by WSB LLC. and <br />dated April 17, 2024 details the proposed drainage and utility area to be vacated. <br />RECOMMENDATION <br />124
The URL can be used to link to this page
Your browser does not support the video tag.