My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05-28-2024 Council Meeting Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2024
>
Searchable Packets
>
05-28-2024 Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2024 3:21:52 PM
Creation date
5/24/2024 3:17:15 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
05/28/2024
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fiji Cube Site Performance Agreement page 2 of 11 <br />systems, curbing, lighting, fencing, fire lanes, sidewalks, exterior <br />building architectural design and building elements, site grading <br />and erosion control measures. <br /> <br />Such improvements shall be completed in accordance with Section <br />IV herein. <br /> <br />B. Cost Estimates. The Developer shall provide the City with a written <br />estimate of all applicable costs of the On-Site Work, itemized by <br />type; the estimates shall be based upon the actual estimates <br />provided by the contractors who are to do the Work. Said cost <br />estimates shall be reviewed by the City, and the City shall establish <br />the actual amount of the financial guarantee. The description and <br />estimated cost of Developer's On-Site Work are as follows: <br /> <br /> Description of Improvements Estimated <br />Costs <br />1. Lighting $ 13,500.00 <br />2. Fences / Screen Structures $ 8,500.00 <br />3. Trash Disposal Structures $ 0.00 <br />4. Curbing / Islands / Delineators $ 36,600.00 <br />5. Storm Drainage Systems / Sewers / Catch Basins <br />/ Culverts / Swales $ 70,000.00 <br />6. Public Trails and / or Sidewalk $ 0.00 <br />7. Private Trails and / or Sidewalk $ 0.00 <br />8. Driveway / Curb cut / Parking Lot / Fire Lane $ 182,500.00 <br />9. Water mains / Hydrants / Sanitary Sewers $ 70,000.00 <br />10. Landscaping $ 60,000.00 <br />11. Site Grading $ 180,000.00 <br />12. Erosion Control $ 0.00 <br /> Total Estimated Cost of Developer Improvements $ 621,100.00 <br /> Security Requirement (Total * 35%) $ 217,385.00 <br /> <br />III. DEVELOPER FEES. <br /> <br />A. Trunk Sanitary Sewer Connection Fees <br /> <br />The City established trunk utility connection fees to uniformly <br />distribute the costs of public trunk sanitary sewer infrastructure. The <br />Trunk Utility Connection Fee consists of two components; a Trunk <br />Charge and an Availability Charge. <br /> <br />92
The URL can be used to link to this page
Your browser does not support the video tag.