My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06-05-2024 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
2024 Park Board Packets
>
06-05-2024 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2024 8:28:39 AM
Creation date
5/31/2024 8:01:03 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
06/05/2024
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lino Lakes Comprehensive Plan Update Chapter 10: Parks, Greenways & Trails 10-20 <br />Century Farms North Park (unofficial name) <br />Address: 80 Robinson Drive <br />Classification: Neighborhood Park <br />Size: 8 acres (4 acres contiguous) <br />Description: This is a newly acquired neighborhood park parcel that is currently undeveloped� <br />Development Considerations: The park should be developed to provide necessary <br />neighborhood level recreational amenities but should have a complementary experience to other <br />neighborhood parks within this section of the city to be more unique� A master plan should be prepared <br />to identify the needs and desires of the surrounding neighborhoods prior to development� <br />Cost Estimates <br />New Development Costs: Until a master plan determines the extent of improvements and the <br />types of amenities that should be included, preliminary costs cannot be estimated� Based on similar <br />neighborhood park developments, costs could range from $400,000 to $600,000. <br />Replacement Costs: $0 <br />C
The URL can be used to link to this page
Your browser does not support the video tag.