Laserfiche WebLink
PSA Park Name Stage % Developed Improvements New Development Cost Land Acquisition2 Trail3,5 Park Dedication1,4 Notes <br />1 J 2B 0 1,130,852$ 300,000$ 503,129$ 1,933,981$ Estimates based on a typical 5-6 acre park <br />Arena Acres Park 3 100 <br />Trail access, new playground equipment, improve <br />aesthetics, replace bacsketball court, new tennis <br />court <br />5,000$ -$ 136,739$ 141,739$ <br />New tennis court would replace previous one that was taken <br />out (project completed). New BIT trail <br />Woolan Park 3 0 <br />Natural play experiences, trails/boardwalks, <br />educational/interpretive information, nature <br />viewing areas <br />200,000$ -$ 136,739$ 336,739$ <br />Undeveloped parcel - Trail & Interpretive signage. 4,000 LF of <br />trails w/some boardwalk <br />M 1B 0 1,130,852$ 300,000$ 136,739$ 1,567,591$ Estimates based on a typical 5-6 acre park <br />3 City Hall Park 3 100 <br />New playground, new ballfields or soccer fields, new <br />rink/skating area, picnic shelter, court space, new <br />parking and access, trails (determine best/safest <br />crossing over Main Street) <br />375,000$ -$ 49,787$ 424,787$ <br />A master plan should be prepared to determine extent of <br />improvements and types of amenities - could range from $1 to <br />$2 million (some of these costs could fall under replacements <br />but are placed under new development) <br />Century Farms North Park <br />(Unofficial name)1A 0 1,130,852$ 75,000$ 552,214$ 1,758,066$ Newly acquired park parcel this is currenlty undeveloped. <br />Assume 1.5 ac land acq. @ $50K/acre <br />Behm's Park 1A 100 <br />Replace playground equipment, make playground <br />area accesible, trail connections to the playground <br />and court <br />19,000$ -$ 552,214$ 571,214$ <br />5 Highland Meadows Park 1A 100 Additional trees, irrigation shed -$ -$ 149,361$ 149,361$ <br />6 Lino Park 1A 100 <br />New playground (potential relocation), improved or <br />relocated parking lot, basketball half-court, picnic <br />shelter, nature trails <br />-$ -$ 236,663$ 236,663$ <br />Update master plan to determine extent of improvements and <br />types of amenities fpr new developments <br />9 Sunset Oaks Park 2A 100 New playground, picnic shelter, basketball half <br />court, loop trail, enhanced landscaping 80,000$ -$ 389,180$ 469,180$ <br />10 Woods Edge (K)1A 65 150,000$ -$ -$ 150,000$ Newly developed park, no additional improvements needed at <br />this time <br />11 F 1B 0 1,130,852$ 300,000$ 406,360$ 1,837,212$ Estimates based on a typical 5-6 acre park <br />12 Watermark (G)1A 0 1,130,852$ 300,000$ 627,596$ 2,058,448$ Estimates based on a typical 5-6 acre park includes 2,000 LF of <br />internal trail <br />Sunrise Park 1A 100 <br />Improved parking, new hockey rinks, new <br />playground equipment, loop trail system, <br />hardcourts, new park building <br />-$ -$ -$ -$ <br />A master plan should be prepared for this park prior to any <br />new development - could be in the range of $3.5 million <br />Wenzel Farms Park 1A 100 Trail connection to court, replace playground <br />equipment when needed -$ -$ -$ -$ <br />14 Marshan Park 1A 100 <br />Trail connections to playground/parking lot, <br />basketball half-court with pickleball overlay, <br />landscape improvements, picnic shelter, new <br />playground equipment when needed <br />100,000$ -$ -$ 100,000$ <br />15 Rice Lake Estates -$ -$ -$ Located in Circle Pines <br />16 Country Lakes Park 1A 25 <br />Paved parking lot, educational information, <br />improved water access, improved picnic spaces, <br />unique play experience <br />650,000$ -$ -$ 650,000$ <br />Need to develop a master plan - could range from $500,000 to <br />$800,000. Community park costs split between park <br />dedication and general fund <br />17 Quail Ridge Park 1A 0 Playground, open lawn, picnic amenities, overlooks, <br />trails to connect to existing trails 450,000$ -$ -$ 450,000$ <br />Undeveloped parcel - $150,000 to $200,000 for park <br />development additional $250,000 to $300,000 for trails and <br />boardwalk connections <br />18 Pheasants Hill Park 1A 100 New playground equipment, trail connection to <br />basketball court, updated amenities -$ -$ 252,441$ 252,441$ <br />19 E 1B 0 1,130,852$ 300,000$ 91,159$ 1,522,011$ Estimates based on a typical 5-6 acre park <br />20 North Pointe Park 1A 100 -$ -$ 213,873$ 213,873$ Newly developed park, no additional improvements needed at <br />this time <br />Clearwater Creek O/S 1A -$ -$ -$ Open Space <br />Clearwater Creek Park 1A 100 New playground surfacing, additional <br />landscaping/trees -$ -$ -$ -$ <br />22 Woods of Baldwin Lake Park 1A 100 <br />New playground equipment, park signage, new <br />benches and tables, small seating overlook, <br />vegetation management, replace trails as needed <br />-$ -$ 246,130$ 246,130$ <br />Shenandoah Park 1A 100 <br />New playground equipment, seating plaza/shelter, <br />trail to playground, small hardcourt, boardwalk <br />overlooking the channel <br />80,000$ -$ 73,200$ 153,200$ <br />Planned New Park and Trail Improvements Summary (Pre 2040 Park Development) <br />Funding Source <br />2 <br />4 <br />13 <br />21 <br />Expenditures <br />185