PSA Park Name Stage % Developed Improvements New Development Cost Land Acquisition2 Trail3,5 Park Dedication1,4 Notes
<br />1 J 2B 0 1,130,852$ 300,000$ 503,129$ 1,933,981$ Estimates based on a typical 5-6 acre park
<br />Arena Acres Park 3 100
<br />Trail access, new playground equipment, improve
<br />aesthetics, replace bacsketball court, new tennis
<br />court
<br />5,000$ -$ 136,739$ 141,739$
<br />New tennis court would replace previous one that was taken
<br />out (project completed). New BIT trail
<br />Woolan Park 3 0
<br />Natural play experiences, trails/boardwalks,
<br />educational/interpretive information, nature
<br />viewing areas
<br />200,000$ -$ 136,739$ 336,739$
<br />Undeveloped parcel - Trail & Interpretive signage. 4,000 LF of
<br />trails w/some boardwalk
<br />M 1B 0 1,130,852$ 300,000$ 136,739$ 1,567,591$ Estimates based on a typical 5-6 acre park
<br />3 City Hall Park 3 100
<br />New playground, new ballfields or soccer fields, new
<br />rink/skating area, picnic shelter, court space, new
<br />parking and access, trails (determine best/safest
<br />crossing over Main Street)
<br />375,000$ -$ 49,787$ 424,787$
<br />A master plan should be prepared to determine extent of
<br />improvements and types of amenities - could range from $1 to
<br />$2 million (some of these costs could fall under replacements
<br />but are placed under new development)
<br />Century Farms North Park
<br />(Unofficial name)1A 0 1,130,852$ 75,000$ 552,214$ 1,758,066$ Newly acquired park parcel this is currenlty undeveloped.
<br />Assume 1.5 ac land acq. @ $50K/acre
<br />Behm's Park 1A 100
<br />Replace playground equipment, make playground
<br />area accesible, trail connections to the playground
<br />and court
<br />19,000$ -$ 552,214$ 571,214$
<br />5 Highland Meadows Park 1A 100 Additional trees, irrigation shed -$ -$ 149,361$ 149,361$
<br />6 Lino Park 1A 100
<br />New playground (potential relocation), improved or
<br />relocated parking lot, basketball half-court, picnic
<br />shelter, nature trails
<br />-$ -$ 236,663$ 236,663$
<br />Update master plan to determine extent of improvements and
<br />types of amenities fpr new developments
<br />9 Sunset Oaks Park 2A 100 New playground, picnic shelter, basketball half
<br />court, loop trail, enhanced landscaping 80,000$ -$ 389,180$ 469,180$
<br />10 Woods Edge (K)1A 65 150,000$ -$ -$ 150,000$ Newly developed park, no additional improvements needed at
<br />this time
<br />11 F 1B 0 1,130,852$ 300,000$ 406,360$ 1,837,212$ Estimates based on a typical 5-6 acre park
<br />12 Watermark (G)1A 0 1,130,852$ 300,000$ 627,596$ 2,058,448$ Estimates based on a typical 5-6 acre park includes 2,000 LF of
<br />internal trail
<br />Sunrise Park 1A 100
<br />Improved parking, new hockey rinks, new
<br />playground equipment, loop trail system,
<br />hardcourts, new park building
<br />-$ -$ -$ -$
<br />A master plan should be prepared for this park prior to any
<br />new development - could be in the range of $3.5 million
<br />Wenzel Farms Park 1A 100 Trail connection to court, replace playground
<br />equipment when needed -$ -$ -$ -$
<br />14 Marshan Park 1A 100
<br />Trail connections to playground/parking lot,
<br />basketball half-court with pickleball overlay,
<br />landscape improvements, picnic shelter, new
<br />playground equipment when needed
<br />100,000$ -$ -$ 100,000$
<br />15 Rice Lake Estates -$ -$ -$ Located in Circle Pines
<br />16 Country Lakes Park 1A 25
<br />Paved parking lot, educational information,
<br />improved water access, improved picnic spaces,
<br />unique play experience
<br />650,000$ -$ -$ 650,000$
<br />Need to develop a master plan - could range from $500,000 to
<br />$800,000. Community park costs split between park
<br />dedication and general fund
<br />17 Quail Ridge Park 1A 0 Playground, open lawn, picnic amenities, overlooks,
<br />trails to connect to existing trails 450,000$ -$ -$ 450,000$
<br />Undeveloped parcel - $150,000 to $200,000 for park
<br />development additional $250,000 to $300,000 for trails and
<br />boardwalk connections
<br />18 Pheasants Hill Park 1A 100 New playground equipment, trail connection to
<br />basketball court, updated amenities -$ -$ 252,441$ 252,441$
<br />19 E 1B 0 1,130,852$ 300,000$ 91,159$ 1,522,011$ Estimates based on a typical 5-6 acre park
<br />20 North Pointe Park 1A 100 -$ -$ 213,873$ 213,873$ Newly developed park, no additional improvements needed at
<br />this time
<br />Clearwater Creek O/S 1A -$ -$ -$ Open Space
<br />Clearwater Creek Park 1A 100 New playground surfacing, additional
<br />landscaping/trees -$ -$ -$ -$
<br />22 Woods of Baldwin Lake Park 1A 100
<br />New playground equipment, park signage, new
<br />benches and tables, small seating overlook,
<br />vegetation management, replace trails as needed
<br />-$ -$ 246,130$ 246,130$
<br />Shenandoah Park 1A 100
<br />New playground equipment, seating plaza/shelter,
<br />trail to playground, small hardcourt, boardwalk
<br />overlooking the channel
<br />80,000$ -$ 73,200$ 153,200$
<br />Planned New Park and Trail Improvements Summary (Pre 2040 Park Development)
<br />Funding Source
<br />2
<br />4
<br />13
<br />21
<br />Expenditures
<br />185
|