My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06-03-2024 Council Work Session Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2024
>
Searchable Packets
>
06-03-2024 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2024 3:12:24 PM
Creation date
6/5/2024 3:04:05 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/03/2024
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
412
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Feasibility Report <br />2024 / 2025 Street Reconstruction and Municipal Sewer and Water Extension Project Colonial Woods City of Lino Lakes, MN WSB Project No. 023620-000 Page 3 3. Existing Conditions 3.1. Streets The roadway condition of Red Maple Lane includes various severities of distress including delamination <br />and potholes, minor alligator, block, transverse, and longitudinal cracking, along with a few localized <br />drainage issues. The roadway is approximately 45 years old is generally 28 feet wide and has rolled <br />bituminous curb that has diminished over time. Red Maple Lane is within a 60-foot wide right of way. 62nd Street east of West Shadow Lake Drive is 30 feet wide and the concrete curb and gutter ends 60 feet <br />east of West Shadow Lake Drive. 62nd Street is within a 50 to 70 foot wide right of way. The total length of <br />roadway improvements, Red Maple Lane and 62nd Street, included with this project is approximately 0.64 <br />miles. There is an existing trail between 6273 and 6283 Red Maple Lane that connects to the street called Fox <br />Circle to the north. 2024 Street Reconstruction Project Existing Conditions Street Segment From To Length Existing Width 62nd Street W Shadow Lake Drive Red Maple Lane 415’ 30’ <br />Red Maple Lane 62nd Street 62nd Street 3075’ 28’ 3.2. Drainage There are 3 main drainage areas in the Colonial Woods neighborhood and the project encompasses 40 <br />acres of land. Street runoff flows along the sides of the pavement and into the grass and low areas or is <br />collected by the existing storm sewer drains at the southeast corner of Red Maple Lane. There is a <br />existing 20 foot wide drainage and utility easement between 6339 and 6331 Red Maple Lane. Within the <br />easement is a storm system structure. There is also a drainage and utility easement along the east and <br />northerly property line of address 707 62nd Street. On the southerly end of the project area, there are also storm sewer drains at the intersection of Red <br />Maple Lane and 62nd Street north side. These drains lead to a ditch system that runs through 6347 and <br />6339 Red Maple Lane. The intersection of West Shadow Lake Drive and 62nd Street is drained by storm <br />sewer that outlets to the south between properties 690 62nd Street and 760 62nd Street. There are multiple <br />wetlands and stormwater basins within and adjacent to the project. DRAF <br />T <br />232
The URL can be used to link to this page
Your browser does not support the video tag.