My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06-03-2024 Council Work Session Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2024
>
Searchable Packets
>
06-03-2024 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2024 3:12:24 PM
Creation date
6/5/2024 3:04:05 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/03/2024
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
412
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Feasibility Report <br />2024 / 2025 Street Reconstruction and Municipal Sewer and Water Extension Project Colonial Woods City of Lino Lakes, MN WSB Project No. 023620-000 Page 8 6. Project Schedule The proposed schedule for this improvement is as follows: 7. Feasibility and Recommendation The 2024 / 2025 Street Reconstruction and Municipal Sewer and Water Extension Project includes <br />roadway, drainage, sanitary sewer and water system improvements and appurtenant work. The total <br />project costs are estimated to be $4,024,209. Based on our analysis and data presented, the proposed project is feasible, necessary, and cost effective <br />from an engineering standpoint. We recommend reconstruction/construction of the proposed <br />improvements as detailed in this report and as determined financially feasible by the City Council. Task Number Task Description Completion Date 1 Accept Feasibility and Order Public Hearing June 10, 2024 2 Public Hearing July 8, 2024 3 60 days of no action of the City Council Ends September 6, 2024 4 Authorize Preparation of the Plans and Specifications September 23, 2024 5 Authorize the Ad for Bid December 9, 2024 6 Award a Construction Contract March / April 2025 7 Start Construction Spring 2025 8 Complete Construction Fall 2025 DRAF <br />T <br />237
The URL can be used to link to this page
Your browser does not support the video tag.