My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06-10-2024 Council Meeting Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2024
>
Searchable Packets
>
06-10-2024 Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2024 12:16:23 PM
Creation date
6/7/2024 12:04:07 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/10/2024
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br />5.Capital improvement plan; and <br />6.Growth management policies, including MUSA allocation criteria. <br />The Preliminary Plat is consistent with the goals and policies of the comprehensive plan in <br />regards to land use, housing, economic development, transportation, local water management <br />plan, sanitary sewer, water supply and parks, greenway and trails. <br />(b)Consistency with infill policies. A proposed urban subdivision shall meet the city's infill <br />policies: <br />1.The urban subdivision must be located within the Metropolitan Urban Service Area <br />(MUSA) or the staged growth area as established by the city's Comprehensive Plan; <br />2.The cost of utilities and street extensions must be covered by one or more of the <br />following: <br />a.An immediate assessment to the proposed subdivision; <br />b.One hundred percent of the street and utility costs are privately financed by the <br />developer; <br />c.The cost of regional and/or oversized trunk utility lines can be financed with <br />available city trunk funds; and <br />d.The cost and timing of the expenditure of city funds are consistent with the city's <br />capital improvement plan. <br />3.The cost, operation and maintenance of the utility system are consistent with the <br />normal costs as projected by the water and sewer rate study; and <br />4.The developer payments will offset additional costs of utility installation or future <br />operation and maintenance. <br />The Preliminary Plat is consistent with infill policies. The development is within the current <br />Utility Staging Area 1A=2018-2025. The cost, operation and maintenance of the utility system is <br />consistent with the normal costs projected by the water and sanitary system plans. No future <br />utility costs are proposed. <br />(c)Roads or highways to serve the subdivision. A proposed subdivision shall meet the <br />following requirements for level of service (LOS), as defined by the Highway Capacity <br />Manual: <br />1.If the existing level of service (LOS) outside of the proposed subdivision is A or B, traffic <br />generated by a proposed subdivision will not degrade the level of service more than one <br />grade; <br />2.If the existing LOS outside of the proposed subdivision is C, traffic generated by a <br />proposed subdivision will not degrade the level of service below C; <br />3.If the existing LOS outside of the proposed subdivision is D, traffic generated by a <br />proposed subdivision will not degrade the level of service below D; <br />4.The existing LOS must be D or better for all streets and intersections providing access <br />to the subdivision. If the existing level of service is E or F, the subdivision developer must <br />provide, as part of the proposed project, improvements needed to ensure a level of <br />service D or better; <br />287
The URL can be used to link to this page
Your browser does not support the video tag.