My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06-10-2024 Council Meeting Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2024
>
Searchable Packets
>
06-10-2024 Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2024 12:16:23 PM
Creation date
6/7/2024 12:04:07 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/10/2024
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Feasibility Report <br />2024 / 2025 Street Reconstruction and Municipal Sewer and Water Extension Project Colonial Woods City of Lino Lakes, MN WSB Project No. 023620-000 Page 1 1. Executive SummaryThe City’s 2024-2027 Street Reconstruction Plan incorporates multiple roadway improvements, some of which include the Colonial Woods neighborhood. The Colonial Woods neighborhood for the purpose of <br />this study includes Red Maple Lane and 62nd Street (east of West Shadow Lake Drive). The street reconstruction and drainage improvements are planned to be funded through Street Reconstruction <br />Bonds. There are no proposed assessments associated with the roadway and drainage improvements. <br />The City’s pavement management plan identifies these roadways to be in poor condition and <br />recommends reconstruction. The estimated cost of the street and drainage improvements in the Colonial <br />Woods neighborhood is $2,580,649. An exhibit illustrating the Colonial Woods project location is shown in <br />Appendix A . Considering the age of the neighborhood, platted in 1977, and the need for street reconstruction, the City <br />is evaluating the extension of municipal water and sanitary sewer to serve the area. Currently this <br />neighborhood is served by onsite septic systems and private wells. Funding for sanitary sewer and water <br />extension to serve the neighborhood would be through assessments to the benefitting properties, and <br />Area & Unit Trunk Funds. The estimated cost of sanitary sewer and water system improvements is <br />$1,443,560. <br />The cost opinion includes a 10% construction contingency and 20% for indirect costs. The project is <br />proposed to be constructed in either 2024 or 2025 pending permitting timelines. This project is feasible, <br />necessary, and cost effective from an engineering standpoint and should be constructed as proposed herein. DRAFT <br />300
The URL can be used to link to this page
Your browser does not support the video tag.