My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06-10-2024 Council Meeting Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2024
>
Searchable Packets
>
06-10-2024 Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2024 12:16:23 PM
Creation date
6/7/2024 12:04:07 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/10/2024
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Feasibility Report <br />2024 / 2025 Street Reconstruction and Municipal Sewer and Water Extension Project Pine Haven City of Lino Lakes, MN WSB Project No. 023620-000 Page 1 1. Executive SummaryThe City’s 2024-2027 Street Reconstruction Plan incorporates multiple roadway improvements, some of which include the Pine Haven neighborhood. The Pine Haven neighborhood for the purpose of this study <br />includes 81st Street, Danube Street, and Elbe Street. The street reconstruction and drainage <br />improvements are planned to be funded through Street Reconstruction Bonds. There are no proposed <br />assessments associated with the roadway and drainage improvements. The City’s pavement <br />management plan identifies these roadways to be in poor condition and recommends reconstruction. The <br />estimated cost of the street and drainage improvements in the Pine Haven neighborhood is $1,767,338. <br />An exhibit illustrating the Pine Haven project location is shown in Appendix A . Considering the age of the neighborhood, platted in 1976, and the need for street reconstruction, the City <br />is evaluating the extension of municipal water and sanitary sewer to serve the area. Currently this <br />neighborhood is served by onsite septic systems and private wells. Funding for sanitary sewer and water <br />extension to serve the neighborhood would be through assessments to the benefitting properties, and <br />Area & Unit Trunk Funds. The estimated cost of sanitary sewer and water system improvements is <br />$1,568,855. <br />The cost opinion includes a 10% construction contingency and 20% for indirect costs. The project is <br />proposed to be constructed in either 2024 or 2025 pending permitting timelines. This project is feasible, <br />necessary, and cost effective from an engineering standpoint and should be constructed as proposed herein. 346
The URL can be used to link to this page
Your browser does not support the video tag.