Laserfiche WebLink
Feasibility Report <br />2024 / 2025 Street Reconstruction and Municipal Sewer and Water Extension Project Pine Haven City of Lino Lakes, MN WSB Project No. 023620-000 Page 1 1. Executive SummaryThe City’s 2024-2027 Street Reconstruction Plan incorporates multiple roadway improvements, some of which include the Pine Haven neighborhood. The Pine Haven neighborhood for the purpose of this study <br />includes 81st Street, Danube Street, and Elbe Street. The street reconstruction and drainage <br />improvements are planned to be funded through Street Reconstruction Bonds. There are no proposed <br />assessments associated with the roadway and drainage improvements. The City’s pavement <br />management plan identifies these roadways to be in poor condition and recommends reconstruction. The <br />estimated cost of the street and drainage improvements in the Pine Haven neighborhood is $1,767,338. <br />An exhibit illustrating the Pine Haven project location is shown in Appendix A . Considering the age of the neighborhood, platted in 1976, and the need for street reconstruction, the City <br />is evaluating the extension of municipal water and sanitary sewer to serve the area. Currently this <br />neighborhood is served by onsite septic systems and private wells. Funding for sanitary sewer and water <br />extension to serve the neighborhood would be through assessments to the benefitting properties, and <br />Area & Unit Trunk Funds. The estimated cost of sanitary sewer and water system improvements is <br />$1,568,855. <br />The cost opinion includes a 10% construction contingency and 20% for indirect costs. The project is <br />proposed to be constructed in either 2024 or 2025 pending permitting timelines. This project is feasible, <br />necessary, and cost effective from an engineering standpoint and should be constructed as proposed herein. 346