My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/12/2024 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2024
>
06/12/2024 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2024 3:25:31 PM
Creation date
6/7/2024 12:07:06 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
06/12/2024
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br /> <br /> <br /> Allowed Units <br />per Acre Allowed # Units <br />Comp Plan Gross <br />Acres <br />Net <br />Acres Low High Low High <br />Low Density Res 76.16 54.25 1.6 3.0 87 163 <br />Medium Density Res 23.84 20.73 4.0 6.0 83 124 <br />High Density Res 39.44 28.67 6.0 8.0 172 229 <br />Planned Res / Comm 16.30 5.21 8.0 10.0 42 52 <br /> <br />TOTAL 155.73 108.86 383 569 <br />GROSS DENSITY 2.5 3.7 <br />NET DENSITY 3.5 5.2 <br /> <br />The preliminary net density ranges would be 3.5 to 5.2 units per net acre which equates <br />to a range of 383 to 569 housing units. The applicant is proposing 434 housing units <br />which is consistent with the density range. It should be noted that net acreage will be <br />re-calculated based on post-development during the preliminary plat process. <br /> <br />Gateway <br /> <br />The intersection of Main Street and Sunset Avenue is identified as a Gateway location in <br />the City’s 2040 Comprehensive Plan. Guidance for Planning District 2, states that a <br />gateway should be planned and created at this location. The City undertook a gateway <br />planning process in 2023. The Sunset and Main Street intersection was included in this <br />process and a preferred concept was completed. The intersection is proposed to have <br />a landscaped roundabout and Lino Lakes monument sign. A seating area is also <br />proposed in the southeast corner of the intersection adjacent to the planned greenway <br />connection. With the exception of a utility conduit running to the RAB, no <br />improvements are included in the current reconstruction project. The existing rural <br />section of roadway limited placement of new facilities at this time. A more <br />comprehensive design will need to be completed as development is considered north <br />and south of the intersection. <br /> <br />Growth Management Strategy <br /> <br />Page 3-17 of the 2040 Comprehensive Plan details the City’s Growth Management <br />Strategy. The strategy works in conjunction with the City’s utility staging plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.